31
Installation
31
• Bolt L-bracket to front of base, drilling and tapping holes in appropriate area.
• Attach dump light switch to L-bracket.
• Drill and tap ¼-20 hole in bottom of secondary tube. Hole should be located
directly above dump light switch when secondary is in lowered position.
• Screw in elevator bolt, and adjust so that switch is engaged when secondary is in
lowered position.
• Install light in bracket provided with control console.
• Complete the wiring; following instructions provided with dump light kit.
Elevator bolt
L-bracket
Dump light switch
Detail A
Scale 1 : 8
Dump Light Kit Installation
Содержание Flex36 108-12
Страница 14: ...8 Flex36 Owner s Manual...
Страница 22: ...16 Flex36 Owner s Manual...
Страница 24: ...18 Flex36 Owner s Manual Decal Kit Placement PN 35559 PN 35559...
Страница 42: ...36 Flex36 Owner s Manual multi lift only Subframe Model 60 8...
Страница 43: ...Installation 37 Subframe Model 84 10...
Страница 44: ...38 Flex36 Owner s Manual Subframe Model 108 12...
Страница 45: ...Installation 39 Subframe Model 120 14...
Страница 46: ...40 Flex36 Owner s Manual...
Страница 66: ...60 Flex36 Owner s Manual...