![STEIN PROJECT Скачать руководство пользователя страница 5](http://html1.mh-extra.com/html/stein/project/project_installation-instructions-manual_1370393005.webp)
5
3. Ensure the floor channel positions are marked.
4.
Peel off the backing tape under the floor channels and
waterbar and carefully bond these to the tray.
5. Place self-adhesive block as shown in this diagram.
1. Floor channel line is 1mm in from wall channel.
2.
Temporally place the return panel floor channel in position, cut waterbar to 605mm to mark out
panel hinge panel floor channel outer point (Diagram B).
INSTALLATION STEP 2
FLOOR CHANNELS
Floor Channel
Waterbar
positioned out
2mm past Hinge
Panel Floor
Channel
DIAGRAM C
Packing to level up glass panels is important step and the initial set-up is based on 2mm packers.
Variation in packing will be needed. Refer to next page for essential detailing including Diagram E.
INSTALLATION STEP 3
LEVELLING OF FIXED GLASS WITHIN FLOOR CHANNELS
Check levels of
Floor Channel
Check levels of
Floor Channel
Initially place
packer across the
top of Channel to
assess levelling
D1
D2
DIAGRAM D
Outer Floor
Channel Points
Door
600m
m
Hinge
Gap
Door
to
Return
Panel
Gap
Self adhesive blocks
3mm
2.5 to 3mm
Waterbar
DIAGRAM B
Channels are cut to length
and stop short of wall
channel. This is required for
the vertical profile on the
back of the glass panel to
fit behind.