![STEIN PROJECT Скачать руководство пользователя страница 2](http://html1.mh-extra.com/html/stein/project/project_installation-instructions-manual_1370393002.webp)
2
WARRANTY
• This covers faulty product. Check www.stein.co.nz for full details of warranty.
• Any breakage on site will not be covered.
• The installation must conform to the instructions for the warranty to apply.
HEALTH & SAFETY
• Glass is heavy and requires two people to handle in most applications.
• Always stand glass up after unpacking the components and use soft packing when in
contact with hard surfaces. Take care not to strike an edge or corner on a hard surface.
• All glass is toughened and cannot be reworked or drilled.
• Wear protective gloves and eye protection.
• Special care should be taken when drilling walls to avoid hidden pipes or electrical cables.
IMPORTANT PREPARATION STEPS !
1.
Solid fixing must be provided in the walls behind the wall channels. 30mm centre off
outside of the Acrylic tray.
2.
Plumbing fittings in the wall need suitable solid fixings.
3.
All Plumbing must be completed by a registered plumber and be in place prior to being
lined.
4. The wall lining must be a “Wet Area” grade to meet the Building Code.
5.
The floor must be level and flat without deflection. Walls must be plumb and surfaces flat.
6.
The Acrylic Tray and Liner comes with its own specific instructions.
7.
Tiling Option: Floor and Walls must be waterproofed by a certified applicator and a
producers statement provided to Council authority.
Include a Water Stop at the Shower boundary. This must comply with
AS3740 standard.
TOOLS REQUIRED
(NOT SUPPLIED)
PROJECT FRAMELESS SHOWER 2-SIDED
WE RECOMMEND A TRADESMAN FAMILIAR WITH THIS TYPE OF INSTALLATION
MATERIALS REQUIRED
(NOT SUPPLIED)
• Rags and suitable cleaning materials
•
Acrylic Shower - Sika Silaflex NG Silicone (from your merchant)
• Tile Shower - Bostik V60 (available from glazing companies)