background image

NOV 2020

IMPORTANT!

1.  When you receive your Project Shower package please check for any freight damage.
2.  If damage has occurred advise your supplier within 8 hours.
3.  Do not install any faulty product as this will invalidate later claims.

PROJECT SHOWER 2-SIDED FRAMELESS

Содержание PROJECT

Страница 1: ...ive your Project Shower package please check for any freight damage 2 If damage has occurred advise your supplier within 8 hours 3 Do not install any faulty product as this will invalidate later claim...

Страница 2: ...centre off outside of the Acrylic tray 2 Plumbing fittings in the wall need suitable solid fixings 3 All Plumbing must be completed by a registered plumber and be in place prior to being lined 4 The...

Страница 3: ...ith 3M Tape PAR1215 2 5 Door Seal PAR1210 1 14 Support Panel PAR1216 1 6 Handle Set PAR1211 1 15 Screws M4x8 PAR1036 8 7 Door Panel 1 16 Screw Cover Caps PAR1036 8 8 Buffer Seal PAR1212 1 17 Hinge Pan...

Страница 4: ...m standard option using vertical seals either side of the door The door gaps will be 4mm wider than standard version Start at the outset if applying this option Go to appendage page 10 to get all the...

Страница 5: ...or Channel DIAGRAM C Packing to level up glass panels is important step and the initial set up is based on 2mm packers Variation in packing will be needed Refer to next page for essential detailing in...

Страница 6: ...but analyse your requirements Height Adjustment at wall To reduce height from 2mm packing also needs trimming the bottom of vertical profile this amount Standard past glass is 4mm Packing above 2mm w...

Страница 7: ...ng edges and check door gap is 606mm max DIAGRAM G WALL CHANNEL FLOOR CHANNEL Apply silicone on the Wall Channel leading edge both sides Apply silicone on the inside of the Floor Channel on the leadin...

Страница 8: ...back for door clearance 3 Ensure these are tight and adjusted to door opening measurement 1 Fit hinges to the hinge panel glass 17 Diagram J1 2 Fit handle 6 to door Diagram J2 3 Install the door 7 in...

Страница 9: ...ERNAL JOINTS 1 Silicone seal boundary joints as indicated including detailing of corners SCREENS THAT ARE SEALED ON THE INSIDE WILL VOID WARRANTY UNLESS INDICATED OTHERWISE IN THIS MANUAL DIAGRAM K CO...

Страница 10: ...PAGE 4 6MM REQUIRES FINAL ADJUSTMENT 6 5MM GAP VERTICAL SEAL ADJUST TOP SUPPORT GLASS BRACKET TO ACT AS A DOORSTOP DIAGRAM 2 DETAILING OF SEAL AND SUPPORT GLASS BRACKET POSITION A Hinge Gap 3 5mm B D...

Отзывы: