5
Installing with an existing mixer tap or dishwasher tap
1.
Turn the main water supply off.
2.
Locate the cold water supply to your kitchen sink tap or dishwasher tap
3.
Disconnect the flexible hose from the mixer or dishwasher tap (the use of a
flexible hose which complies with Australian Standards is recommended).
4.
Use the teflon plumbers tape provided to wrap around the male ends of the
shut off connection valve and the cold water supply or dishwasher tap,
winding in a clockwise direction 3 or 4 times
5.
Fit the shut off connection valve to the flex hose and the mains water supply.
6.
Ensure the valve is in the “OFF” position and turn the mains water on to
check for any leaks on this part of the installation. If no leaks occur, turn the
mains water back off until ready to test the final installation. If leaks occur,
remove the mains shut off valve and re tape and refit and recheck for leaks
INSTALLATION INSTRUCTIONS - STEP 1
The Triple Undersink Water Filtration System can be fixed in 2 different ways below are the
options:
To find the right location, you require at least 400mm in height and sufficient access to
change the filter cartridge as required on a regular basis. Avoid areas of high use to
reduce the risk of hitting the housing or connections that may result in breakage or leaking
Содержание Triple Undersink
Страница 1: ......