Electrical Parameters
Rated Voltage
Frequency
Motor Power
Voltage of Control
Circuit
110V~120v
60HZ
0.745KW(1HP)/1.0KW
5.5-6.5 Amps
DC12V
Electrical Requirements
1 dedicated 12-2 or 12-3 line for water pump (line 1, ground and neutral)
110 volt, 15-20 amp GFCI breaker
There is a length of wire supplied to connect to power source
Optional: inline heater 110V/12-15 Amp / 30AMP total REQUIRED for Motor & Heater
Plumbing Requirements
The unit is equipped with hot and cold, metal braided ½ inch water supply hose with ½ national pipe
thread.
Need to install hot and cold shutoffs with ½ -male national pipe thread (not included).
Supply hoses are to connect from the faucet manifold on the unit to the shutoff valves.
All water jet features are pre plumbed with reinforced braided flexible supply hose
All fixtures and fittings should be checked for tightness as they may have been loosened during
transport. Access panel area advised.
Tub Installation
A. Water Head: One cold water supply pipe, one hot water supply pipe.
B. Drainage: The diameter of the drain should be (greater than or equal to) 40mm. This drainage can
be at a distance of 300-400mm from the location we show on the chart.
1. Unpack the bathtub and move it into the desired position. Adjust the floor bolts to
completely remove water from the drainer and secure the nut. All feet need to be
touching the floor and tub needs to be level.
2. Insert the skirt into the upper slot of the bathtub, then press the flat-head on the
bathtub rack onto the skirt. Tighten bolts.
3. Install and fix the sprayer, storage rack, and other external parts.
4. Carefully ground the bathtub.