background image

2

Contents

1. Electrical specifications
2. Plumbing
3. Installation of Water connections
4. Installation of Drain
5. Operation of Bathtub
6. Troubleshooting
7. Cleaning and Maintenance

GENERAL INFORMATION

Note:

All tubs need to be leveled in its final resting position and have all feet touching

the ground.

It is advised to have tub onsite before preparing drain location.

Manufacturer reserves the right to change specs or features at anytime. Please
check to confirm details. 1-866-783-2661

Отзывы: