![Steadicam ARCHER2 Скачать руководство пользователя страница 7](http://html1.mh-extra.com/html/steadicam/archer2/archer2_operating-manual_1368164007.webp)
7
Detail: mounting stage
Dovetail bracket
Dovetail locking
mechanism
Video Out/12V
Stage power and
video connectors
Detail: folding sled
Tilt head release levers
Video in
HDSDI BNC
14V and 28V
Camera Power
14V and 28V
Accy Power
Connector
HDSDI BNC
Lower R and B
video
connectors
Monitor
connector
Battery Unfold/Fold
Procedure:
•
While holding the battery mount, rotate
the blue locking knob for the battery
counterclockwise (opposite direction to
“LOCK” marking) until the stop.
•
Rotate the battery mount down and slide
the rail tubes into the guide holes in the
sled base.
•
Rotate the blue locking knob clockwise
(same direction as “LOCK”marking) to
secure the tubes in the desired operating
position.
•
Loosen the lobed knob below the battery
mount and rotate the battery to the desired
operating position; retighten the knob.
•
The folding procedure for the battery is similar
to the unfold procedure taking note that the rail
tubes should be flush with the sled base when
folded for ease of packing.
Monitor Unfold/Fold Procedure:
•
The monitor fold/unfold procedure is similar to
that of the battery unfold/fold procedure taking
note that the monitor mounting bracket on the
post should be lowered all the way down to base
for ease of packing.
Содержание ARCHER2
Страница 1: ...Archer2 Operating Manual v 10 31 09 p n LIT 305000 Archer2 Operating Manual...
Страница 2: ...STEADICAM ARCHER2 Copyright The Tiffen Company 2009 All rights reserved...
Страница 4: ...4 Overview Archer2...
Страница 15: ...15...
Страница 20: ...20 Sled Base Connections Archer2...