PRIOR TO START UP

Installation  and  start  up  of  this  water  heater  requires  abilities 

and skills equivalent to that of a licensed tradesman in the field 

involved, see 

Qualifications

 

(page 6)

.

DO NOT USE THIS APPLIANCE IF ANY PART HAS BEEN 

EXPOSED TO FLOODING OR WATER DAMAGE

. Immediately 

call a qualified service agency to inspect the appliance and to 

make a determination on what steps should be taken next. If the 

unit is exposed to the following, do not operate heater until all 

corrective steps have been made by a qualified service agency.

1. 

External fire

2. 

Damage

3.  Firing without water

Light  the  water  heater  in  accordance  with  the  Lighting  and 

Operation Instruction label on the water heater and in this manual 

Lighting the Water Heater 

(page 54).

The  water  heaters  covered  by  this  manual  are  equipped  with 

an  electronic  control  system,  which  automatically  sequences 

the Combustion Blower, pre and post purging of the combustion 

chamber,  the  spark  transformer,  the  24-volt  gas  valve,  Main 

Burner ignition, and flame sensing. The control system will lock 

out after three unsuccessful ignition attempts. See 

Control System 

Operation 

(page 45).

START-UP PREPARATION

Before  attempting  start  up,  thoroughly  study  and  familiarize 

yourself with the exact 

Sequence Of Operation 

(page 57). Ensure 

the water heater is properly grounded. Flame sensing requires an 

adequate earth ground. If the water heater is not properly grounded 

it will cause ignition failure.
Be certain that the water heater is full of water, that air is purged 

from the gas and water lines and that there are no leaks in the gas 

and water lines. Ensure all inlet water valves are open.

FILLING THE WATER HEATER

Follow these steps to fill the water heater prior to start up.

1. 

Close the heater drain valve.

2. 

Open  a  nearby  hot  water  faucet  to  permit  air  in  system  to 

escape.

3.  Fully open the cold water inlet valve allowing the piping and 

water heater to fill with water.

4. 

Close the hot water faucet opened in Step 2 as water starts 

to flow.

INITIAL START UP

REQUIRED TEST EQUIPMENT

• 

One  U-tube  manometer,  recommended  ranges;  0-14” 

W.C. (0-3.5 kPa) and 0-35” W.C. (0-8.7 kPa) or pressure 

gauges. 

• 

One  digital  manometer  can  be  used  in  place  of  U-tube 

manometers or pressure gauges. Recommended ranges; 

-14.00 to +14.00” W.C. (0-3.5 kPa) resolution 0.01” W.C. 

and 0-35” W.C. (0-8.7 kPa) resolution 0.10” W.C.

Note: 

All test equipment must be acclimated to ambient 

temperature before calibration and use.

START-UP PROCEDURE

1. 

Using the control system menus, change the Operating Set 

Point to the lowest temperature setting. See 

Operating Set Point 

and Differential Adjustment 

(page 48).

2. 

Turn the water heater’s Enable/Disable switch to the "Disabled" 

position.

3.  Close the Main Gas Shut Off Valve, see 

Figure 54 

(page 40).

4. 

Wait five (5) minutes for any residual gas to clear.

5. 

Connect the manometer to the supply gas pressure port on the 

gas valve. See 

Figure 60 

(page 53) and 

Figure 61 

(page 53)

.

Note: 

The manometer tubing should be purged before 

taking any readings.

Water heaters covered by this manual have test ports for  

supply and manifold gas pressure readings on the gas 

valve. Using a small flat tip pocket screw driver - open 

the needle valve inside the supply gas pressure test port 

one full turn only; turn the needle valve screw counter-

clockwise to open the valve. Slide the manometer sensing 

tube over the top of the test port. See 

Figure 60 

(page 53)

 

and 

Figure 61 

(page 53)

.

6.  Open the Main Gas Shutoff Valve.

7. 

Measure and record the supply gas pressure, this is a “static” 

supply gas pressure reading; while the water heater is not firing. 

Adjust supply gas pressure as necessary. See 

Initial Start Up 

(page 53)

.

MANIFOLD GAS

PRESSURE

TEST PORT

(

Non-Adjustable

)

SUPPLY GAS

PRESSURE

TEST PORT

VENTURI

COMBUSTION

AIR INLET

GAS

VALVE

COMBUSTION

BLOWER

CONNECTION

Figure 60. Gas Valve/Venturi Assembly Top View

MANIFOLD GAS 

PRESSURE 

TEST PORT

(

Non-Adjustable

)

SUPPLY GAS

PRESSURE TEST PORT

Figure 61. Gas Valve Top Detail View

VENTURI

LOW GAS

PRESSURE

SWITCH

SUPPLY GAS

CONNECTION

GAS

VALVE

COMBUSTION

AIR INLET

Figure 62. Gas Valve/Venturi Assembly Side View

START UP

Содержание SUF 60120 THRU

Страница 1: ...e instructions is not followed exactly a fire or explosion may result causing property damage personal injury or death Do not store or use gasoline or other flammable vapors and liquids in the vicinit...

Страница 2: ...mination Installation 27 Polypropylene Installations 28 AL29 4C Vent Installations 29 Common Direct Venting Requirements 29 Concentric Termination Installation Preparation 30 Concentric Termination In...

Страница 3: ...o not follow the safety message and how to avoid the risk of injury DANGER WARNING CAUTION CAUTION DANGER indicates an imminently hazardous situation which if not avoided will result in injury or deat...

Страница 4: ...hydrogen is present there will probably be an unusual sound such as air escaping through the pipe as the water begins to flow THERE SHOULD BE NO SMOKING OR OPEN FLAME NEAR THE FAUCET AT THE TIME IT IS...

Страница 5: ...operation Disconnect gas piping at main gas shutoff valve before leak testing heater Install sediment trap in accordance with NFPA 54 or CAN CSA B149 1 Use joint compound or Teflon tape compatible wit...

Страница 6: ...read and be aware of All warnings and all in structions are essential to the proper operation of the water heater and your safety Detailed installation diagrams are also found in this INTRODUCTION ma...

Страница 7: ...ol Board CCB The CCB monitors the water temperature in the tank and regulates the firing rate to achieve the target temperature set point The firing rate is dictated by the hot water draw proximity to...

Страница 8: ...e water heater is not restricted The control system monitors this switch and will disable heating operation if its contacts are open during a heating cycle 8 Supply gas line connection See the require...

Страница 9: ...rol System Operation page 45 8 Temperature Pressure Relief Valve See Temperature Pressure Relief Valve page 15 9 Temperature Pressure Relief Valve discharge pipe see T P Valve Discharge Pipe Requireme...

Страница 10: ...L V E FRONT 1 NPT WATER OUTLET E X H A U S T AIR INTAKE 18 42 26 90 BACK Figure 5 Rough In Dimensions ROUGH IN DIMENSIONS Model Table 1 Dimensions by Model APPROX SHIP WEIGHT STD APPROX SHIP WEIGHT AS...

Страница 11: ...her replacing an existing water heater or installing the water heater in a new location observe the following critical points 1 The water heater must be located indoors 2 The water heater must not be...

Страница 12: ...urns water heaters water piping and other equipment See Maintenance page 63 for sediment and lime scale removal procedures CIRCULATION PUMPS A circulating pump is used when a system requires a circula...

Страница 13: ...l and propane gas Install a positive lock up gas pressure regulator in the gas supply line if inlet gas pressure can exceed these pres sures at any time If a positive lock up regulator is required fol...

Страница 14: ...square inch 103 kPa and 173 kPa Flow pressures above 25 pounds per square inch 173 kPa or below 15 pounds per square inch 103 kPa will result in improperly sanitized dishes Where pressures are high a...

Страница 15: ...er heater is provided with a properly rated sized and certified combination Temperature Pressure Relief Valve T P valve by the manufacturer The valve is certified by a nationally recognized testing la...

Страница 16: ...y local codes Note Lower PH levels are acidic Do not connect a metal drain line such as copper to the water heater for this reason See Condensate Drain Installation page 39 COMBUSTIBLE MATERIAL STORAG...

Страница 17: ...rea through a design of louver or grille or screen is known it shall be used in calculating the size of opening required to provide the free area specified Where the louver and grille design and free...

Страница 18: ...ommencing within 12 inches 300 mm of the top of the enclosure shall be provided See Figure 10 The water heater shall have clearances of at least 1 inch 25 mm from the sides and back and 6 inches 150 m...

Страница 19: ...section of the manual are a reference for the openings that provide fresh air into confined spaces only DO NOT refer to these illustrations for the purpose of vent installation See Venting Installati...

Страница 20: ...above grade directly in line with the exhaust vent terminal for the horizontally vented gas fueled heating appliance or equipment The sign shall read in print size no less than one half 1 2 inch in si...

Страница 21: ...ents page 22 12 Use only factory supplied vent and intake air concentric or low profile terminations See Venting Requirements page 22 13 Do not locate the vent exhaust or intake air terminations where...

Страница 22: ...VC Materials should use ASTM F 493 Grade Cement during severe cold weather To prevent the recirculation of flue gases maintain as much distance as possible between the intake air and vent terminations...

Страница 23: ...te horizontally through a sidewall see Sidewall Termination Installation page PIPE SIZE REQUIREMENTS The water heaters covered in this manual are certified for the use of two three and four inch pipe...

Страница 24: ...ipe transition to three inch pipe at the intake air connection on the water heater as shown in Figure 19 The field installed three inch pipe between the intake air connection and the reducer coupling...

Страница 25: ...cm 18 inches 45 cm in Canada above the average or expected snow level as shown in Figure 22 and Figure 24 page 27 6 When the intake air and or vent piping from multiple water heaters will terminate i...

Страница 26: ...o more than 2 inches 5 cm 11 Return to Power Vent Installation page 23 or Direct Vent Installation page 24 to complete the installation of the intake air and or vent piping between the termination s a...

Страница 27: ...t least 48 inches 122 cm between the intake air and vent termination or any other appliance vent that discharges moisture laden air such as clothes dryers This will reduce possibility of frost over fr...

Страница 28: ...rmination s is still pointing down towards the ground See Figure 26 16 Return to Power Vent Installation page 23 or Direct Vent Installation page 24 to complete the installation of the intake air and...

Страница 29: ...posed of AL29 4C must not mix parts from the different manufacturers The joints of these products are sealed by internal gaskets Do not use any other type of sealant When assembling these vent systems...

Страница 30: ...on page 25 5 When installing a concentric termination through a sidewall ensure that all exterior sidewall clearance requirements for the termination shown in Figure 52 page 38 are being maintained Th...

Страница 31: ...age cracking of the vent cap and or vent pipe 7 Install the vent cap vent pipe assembly into the intake air Y fitting assembly Ensure the small diameter vent pipe is cemented and bottomed in the Y fit...

Страница 32: ...clearances separation between terminations are maintained Ensure multiple terminations are arranged or grouped as required Note These clearances must be maintained to prevent the recirculation of vent...

Страница 33: ...on on clearances See Figure 32 page 32 when installing three concentric terminations SIDEWALL ROOF Figure 36 Two Concentric Terminations Side Wall And Roof Four Concentric Terminations Four concentric...

Страница 34: ...e solvent cementing procedures outlined in the IPEX System 636 Installation Guide which is available on the web www ipexinc com 3 To fasten the base to the wall use the supplied screws and anchors A 3...

Страница 35: ...ke Moisture Protection Figure 45 Direct Vent Horizontal Enlarged View of Direct Vent Air Intake Moisture Protection Figure 46 Direct Vent Vertical Vent Horizontal Intake Enlarged View of Direct Vent A...

Страница 36: ...d View of Direct Vent Air Intake Moisture Protection Figure 49 Direct Vent Horizontal Concentric Enlarged View of Direct Vent Air Intake Moisture Protection Figure 50 Direct Vent Horizontal Low Profil...

Страница 37: ...nto building or combustion air inlet to any other appliance 6 in 15 cm for appliances 10 000 Btuh 3 kW 12 in 30 cm for appli ances 10 000 Btuh 3 kW and 100 000 Btuh 30 kW 36 in 91 cm for appli ances 1...

Страница 38: ...nto building or combustion air inlet to any other appliance 6 in 15 cm for appli ances 10 000 Btuh 3 kW 12 in 30 cm for appli ances 10 000 Btuh 3 kW and 100 000 Btuh 30 kW 36 in 91 cm for appli ances...

Страница 39: ...hese instructions and local building codes Field supplied materials required for installation include Approved PVC cement and PVC primer 1 2 inch PVC pipe minimum length to equal the distance between...

Страница 40: ...RAP Figure 54 Supply Gas Line Installation Ensure all gas pipe is clean on the inside before installation To trap any dirt or foreign material in the gas supply line a sediment trap must be installed...

Страница 41: ...pply system perform a leak test to avoid the possibility of fire or explosion Fire and Explosion Hazard Leak test gas connections before placing water heater in operation Disconnect gas piping at main...

Страница 42: ...wire from the power supply must connect to the black jumper wire or the L1 terminal block location in the junction box and the 120 VAC neutral wire must connect to the white jumper wire or the Neutral...

Страница 43: ...age 15 4 Thermal Expansion and Closed Water Systems page 14 5 For multiple water heater installations see Water Piping Diagrams page 69 WATER PIPING DIAGRAMS This manual provides detailed water piping...

Страница 44: ...ter Never leave a child or disabled person unattended in a bathtub or shower The water heater should be located in an area where the general public does not have access to set temperatures Setting the...

Страница 45: ...on of the various operational states The Desktop screen also displays animated Status Icons to convey operational information see Table 18 page 46 for descriptions of the Status Icons The water heater...

Страница 46: ...Display will read Status Water Heating Disabled For more information see Enable Disable Circuit page 42 The Combustion Blower is being energized The Spark Igniter is being energized See Figure 2 page...

Страница 47: ...eater must be cycled off and on at the breaker to reset the control system NOTE Cycling power will not reset the control system if the condition that caused the Fault has not been corrected CONTROL SY...

Страница 48: ...tem Note Higher Temperature settings increase wear and operating costs Set the Operating Set Point to the lowest setting which produces an acceptable hot water supply This will always provide the most...

Страница 49: ...fferential 8 F Tank Temperature 120 F Tank Probe Offset 0 F HEATER STATUS MENU Description Action Display Press Heater Status from the Main Menu to enter this menu This menu contains non adjustable op...

Страница 50: ...module Use External Enable Enables Disables the external enable circuit External Enable Status Displays whether or not the external enable circuit has been activated Ignition Trials Displays the numb...

Страница 51: ...The newest event will replace the oldest Faults will clear after 30 days Press the Fault to view details for each Fault or Alert message stored Fault History HELP BACK 1 Upper Temp Probe Open 47 0 day...

Страница 52: ...e setting from No to Yes and press ACCEPT to save the new setting Note The Access Code at the bottom of the Service Contact Information screen is for manufacturing engineering purposes only There are...

Страница 53: ...ot water faucet opened in Step 2 as water starts to flow INITIAL START UP REQUIRED TEST EQUIPMENT One U tube manometer recommended ranges 0 14 W C 0 3 5 kPa and 0 35 W C 0 8 7 kPa or pressure gauges O...

Страница 54: ...h t e h t t e S o t s e t u n i m 5 e v i f t i a W s a g y n a t u o r a e l c s a g l l e m s n e h t u o y f I n i B w o l l o F P O T S u o y f I l e b a l s i h t n o e v o b a n o i t a m r o f...

Страница 55: ...water heater s share a common gas supply main with other gas fired appliances the supply gas pressures shall be measured at each water heater with all gas fired appliances connected to a common main f...

Страница 56: ...ge the Operating Set Point to the lowest temperature setting see Operating Set Point and Differential Adjustment page 48 2 When the water heater has completed its shut down sequence and enters the sta...

Страница 57: ...and repeat the operating cycle TROUBLESHOOTING INSTALLATION CHECKLIST The list below represents some of the most critical installation requirements that when overlooked often result in operational pr...

Страница 58: ...fferential setting a heating cycle is activated Spark Ignition Transformer is energized 24 Volt Gas Valve is energized gas flows to Main Burner Is flame sensed at the Main Burner control system monito...

Страница 59: ...r see instructions in Checking The Firing Rate page 56 Note The water heaters covered by this manual are capable of modulating their firing rate The firing rate is dictated by the hot water draw and v...

Страница 60: ...se rumbling and pounding noises during heating cycles See Maintenance page 63 for sediment and lime scale removal procedures Normal operating noise of electrical components Combustion Blower transform...

Страница 61: ...a manometer ensure the supply gas pressure is above minimum pressure requirement listed on heater s data plate before and during operation Ensure wire connections to gas pressure switch are clean and...

Страница 62: ...e Advanced button for Ensure wire connections to upper temperature probe are clean and tight Using a thermometer check the water temperature of the heater Use a multi meter and check for continuity be...

Страница 63: ...move sediment and allow the water to flow until it runs clean 9 Close the water heater drain valve when flushing is completed 10 Remove the drain hose 11 Fill the water heater see Filling The Water He...

Страница 64: ...checking the Temperature Pressure Relief Valve operation make sure that 1 no one is in front of or around the outlet of the Temperature Pressure Relief Valve discharge line and 2 that the water discha...

Страница 65: ...y operating the valve it fails to completely reset and continues to release water immediately close the cold water inlet to the water heater and drain the water heater see Draining And Flushing page 6...

Страница 66: ...LAYOUT 11 12 1 J16 J5 J3 J13 J4 J17 J10 J9 J14 J15 J1 J6 J12 1 1 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 2 2 3 3 3 3 3 3 3 3 3 3 3 4 4 4 4 4 4 4 4 4 4 4 5 5 5 5 5 5 6 6 6 6 6 6 7 7 8 8 8 9 9 7 10 8 F...

Страница 67: ...67 WIRING DIAGRAM Figure 67 Wiring Diagram...

Страница 68: ...0 VAC POWER NOTE USE SEPARATE 120 VAC POWER SUPPLY FOR PUMP CIRCUIT DO NOT SHARE POWER WITH WATER HEATER AS THIS MAY CAUSE ELECTRICAL LINE NOISE AND LEAD TO ERRATIC CONTROL SYSTEM OPERATION FIELD SUPP...

Страница 69: ...N ONE WATER HEATER SINGLE TEMPERATURE WITH BUILDING RECIRCULATION NOTES 1 Preferred piping method 2 The temperature and pressure relief valve setting shall not exceed pressure rating of any component...

Страница 70: ...WITH BUILDING RECIRCULATION NOTES 1 Preferred piping method 2 The temperature and pressure relief valve setting shall not exceed pressure rating of any component in the system 3 Service valves are sho...

Страница 71: ...exceed pressure rating of any component in the system 3 Service valves are shown for servicing unit However local codes shall govern their usage 4 The tank temperature control should be wired to and...

Страница 72: ...stat should be set 5 degrees F higher than the tank temperature control LEGEND TEMPERATURE PRESSURE RELIEF VALVE PRESSURE RELIEF VALVE CIRCULATING PUMP TEMPERATURE CONTROL PROBE DRAIN FULL PORT BALL V...

Страница 73: ...E CIRCULATING PUMP TEMPERATURE CONTROL PROBE DRAIN FULL PORT BALL VALVE TEMPERATURE GAGE WATER FLOW SWITCH CHECK VALVE WARNING THIS DRAWING SHOWS SUGGESTED PIPING CONFIGURATION AND OTHER DEVICES CHECK...

Страница 74: ...ING PUMP TEMPERATURE CONTROL PROBE DRAIN FULL PORT BALL VALVE TEMPERATURE GAGE WATER FLOW SWITCH CHECK VALVE WARNING THIS DRAWING SHOWS SUGGESTED PIPING CONFIGURATION AND OTHER DEVICES CHECK WITH LOCA...

Страница 75: ...he temperature and pressure relief valve setting shall not exceed pressure rating of any component in the system 3 Service valves are shown for servicing unit However local codes shall govern their us...

Страница 76: ...d by improper gas supply line sizing gas type venting connections combustion air voltage wiring or fusing Failure to follow applicable codes Failure to follow printed instructions Abuse misuse acciden...

Страница 77: ...77 NOTES...

Страница 78: ...78 NOTES...

Страница 79: ...79 NOTES...

Страница 80: ...500 Tennessee Waltz Parkway Ashland City TN 37015 Tech Support 800 365 0024 Parts 800 821 2017 www statewaterheaters com Copyright 2018 State Water Heaters All rights reserved...

Отзывы: