
52
Maintenance
Sefam S.Box
Connect the display ribbon into the main board connector (Fig.1).
Lock the connector (Fig.2).
Place the IP protection on the main board. Place the IP protection carefully on the capacitor
(Fig.1).
Slide the IP protection tabs between the edge of the main board and the bottom cover.
(Fig.2).
Place the top cover (check that it is inserted into the rear panel rib).
Close the top cover by tightening the 4 screws with T10 tip equipped screwdriver, until it
locks.
Fig.2
capacito
r
Tabs
Fig.1
Fig.1
Fig.2
Содержание Sefam S.Box
Страница 1: ......