GW1200 Gateway Installation & Configuration Guide
17
1.
Cut the Mounting Adaptor (A) so that only Section # 1 remains.
Use Mount Adaptor part marked with “<= 1 =>”
2.
Step 2 – Fasten 2 Screws (E) on the 512HD Bracket (D) with 1 Flat Washer (H) and 1
Spring Washer (I). Set the distance between the Screws using the Adaptor (A).
3.
Drill 2 holes* in the designated for installation ceiling tile for the Screws (E). Use the
assembled 512HD Bracket (D) to mark the location of the holes.
* Holes should be 5/16” or 8mm in diameter