Commissioning Instructions
17
FIG. 11
SW/L
COOKER
N/A
SW/L
BOILER
N/A
PL
- LIVE
PN -
NEUTRAL
PL
- LIVE
PN
- NEUTRAL
L
LIVE
N
NEUTRAL
E
EARTH
COOKER SWITCHED - LIVE
SPARE
SPARE
EXTERNAL PROGRAMMER - LIVE - MUST BE
CONNECTED DIRECTLY TO THIS SUPPLY
EXTERNAL PROGRAMMER - NEUTRAL
PUMP SUPPLY - LIVE (THE CIRCULATING PUMP MUST
BE CONNECTED DIRECTLY TO THIS SUPPLY)
PUMP SUPPLY - NEUTRAL (THE CIRCULATING PUMP
MUST BE CONNECTED DIRECTLY TO THIS SUPPLY)
3 AMP PERMANENT SUPPLY
NOTE:
The 3 channel programmer
LIVE
must be connected directly to the programmer
LIVE
supply from the cooker.
TERMINAL STRIP CONNECTIONS
BOILER SWITCHED - LIVE
Содержание Alpha 120K
Страница 13: ...13 Site requirements FIG 6 External wiring with 2 zone valves ...
Страница 14: ...Site requirements 14 FIG 7 ...
Страница 22: ...22 FIG 16 ...
Страница 23: ...23 ...