212485 / 7579615300
2011-09-13·BA00·III·en·00
Putting into Service
7
SolConeX Plug
G579/12
Strip the insulation from the cable (see figure).
Connect the cable to the plug insert. The stripped cable ends must be pushed fully
underneath the clamping plate.
Align the cable such that the clamping points are not under strain.
Mount the strain relief (D).
Fasten the plug insert in the enclosure such that key and guiding groove (E) match.
Press the seal into the enclosure.
Place the pressure ring on the seal.
Tighten the pressure screw (B).
Secure the pressure screw with the clamp (C).
12 Putting into Service
Before putting into service
Make sure that the components are not damaged.
Make sure that the device has been installed correctly.
Remove any foreign objects from the device.
Check if cable glands and stopping plugs are tight.
Check if screws and nuts are fastened tightly.
Inspect the cable glands for signs of damage.
Check the tightening torques.
Make sure that the bayonet lock is tightened correctly.
09290T00
On the connection side, the contact pin carrier is marked with "Abisolation"
(insulation stripped) next to the protective conductor connection symbol.
The indentation below indicates the correct stripping length.
WARNING
The plug may only be used when fully mounted.
The plug pin surface must not be damaged.
Excessive tightening of the components can impair the degree of protection.
a
[mm]
b
[mm]
80
17
Содержание G579/12
Страница 1: ...Operating Instructions SolConeX Plug G579 12 ...
Страница 10: ......
Страница 11: ......
Страница 12: ...212485 7579615300 2011 09 13 BA00 III en 00 ...