![Stahl 8624-1 Скачать руководство пользователя страница 54](http://html1.mh-extra.com/html/stahl/8624-1/8624-1_operating-instructions-manual_1357672054.webp)
Commissioning
24
167921 / 862460300010
S-BA-8624/1-01-en-30/07/2008
Control unit Ex p
8624/1
10 Commissioning
Before commissioning, ensure that:
X
the cover of the control unit is correctly closed,
X
unused cable entries are sealed with plugs certified to Directive 94/9/EC, and unused
holes are sealed by stopping plugs certified to Directive 94/9/EC.
X
the operating mode and the purging process is set according to the corresponding
zone.
11 Maintenance
11.1 Regular Maintenance Work
X
Consult the relevant national regulations (e.g. IEC/EN 60079-17) to determine the type
and extent of inspections.
X
Plan the intervals so that any defects in the equipment which may be anticipated are
promptly detected.
To check as part of the maintenance schedule:
X
Check that cables are clamped properly.
X
Inspect device for visible damage.
X
Compliance with the permitted temperatures in accordance with IEC/EN 60079-0.
X
Make sure the device is used according to its designated use.
11.2 Cleaning
The inspection window of the control unit must be cleaned only when it is heavily soiled.
X
Clean with a moist cloth.
X
Use water or mild, non-abrasive, non-scratching cleaning agents.
X
Never use aggressive cleaning agents or solvents.
Содержание 8624-1
Страница 1: ...Betriebsanleitung Operating Instructions Steuereinheit Ex p Control unit Ex p 8624 1...
Страница 2: ......
Страница 3: ...Betriebsanleitung Steuereinheit Ex p 8624 1...
Страница 31: ...Operating Instructions Control unit Ex p 8624 1...
Страница 58: ......
Страница 59: ......
Страница 60: ...167921 862460300010 S BA 8624 1 01 de en 30 07 2008...