ELECTRICAL WIRING INSTALLATION

RISK OF ELECTRICAL SHOCK OR ELECTROCUTION. The SuperFlo

® 

VS Variable Speed

 

Pump must be installed by a 

licensed or certified electrician or a qualified service professional in accordance with the National Electrical Code and all 

applicable local codes and ordinances. Improper installation will create an electrical hazard which could result in death 

or serious injury to users, installers, or others due to electrical shock, and may also cause damage to property.

Always disconnect power to the pump at the circuit breaker before servicing the pump. Failure to do so could result 
in death or serious injury to service people, pool users or others due to electric shock and/or property damage. Read 
all servicing instructions before working on the pump.

1.  Be sure all electrical breakers and switches are turned 

off before wiring motor.

2.  Be sure that the wiring voltage matches the motor 

voltage (220-240 Vrms). If they do not match, the 

motor can overheat.

3.  Choose a wire size for the pump in accordance with 

the current National Electrical Code and all applicable 

local codes and ordinances. When in doubt use a 

heavier gauge (larger diameter) wire. Heavier gauge 

will allow the motor to run cooler and more efficient.

4.  Be sure all electrical connections are clean and tight.
5.  Cut wires to the appropriate length so they do not 

overlap or touch when connected to the terminal 

board.

6.  Permanently ground the motor using the ground 

screw located on the inside rear of the controller 

interface,  see figure 4. Use the correct wire size and 

type specified by the current local government .Be 

sure the ground wire is connected to an electrical 

service ground.

7.  The pump should be permanently connected to either 

a circuit breaker, 2-pole timer or 2-pole relay. If AC 

power is supplied by a GFCI circuit breaker, use a 

dedicated circuit breaker that has no other electrical 

loads.

8.  Connect the pump permanently to a circuit. Make 

sure no other lights or appliances are on the same 

circuit.

Wiring

Note: When the pump is started and stopped by 

removing power with a relay or timer, a two-pole 

device should be used to apply and remove power 

to both POWER LINE TERMINALS.

Grounding Screw

Figure 4.

English 

Содержание S5P1R-VS

Страница 1: ...NG BEDIENUNGSANLEITUNG GUIDE DE L INSTALLATION GUIA DE INSTALACION GUIDE ALL INSTALLAZIONE IMPORTANT SAFETY INSTRUCTIONS READ AND FOLLOW ALL INSTRUCTIONS SAVE THESE INSTRUCTIONS WATER SOLUTIONS P INSB...

Страница 2: ...and Functions Quick Start Guide Factory Default Schedule User Defined Schedule Control Panel Overview Navigation Operating the Pump Keypad Overview Setting a Schedule Schedule Tables Pump Operation f...

Страница 3: ...THE OWNER S MANUAL MUST BE LEFT WITH THE POOL OWNER SUCTION ENTRAPMENT HAZARD STAY OFF THE MAIN DRAIN AND AWAY FROM ALL SUCTION OUTLETS F THIS PUMP PRODUCES HIGH LEVELS OF SUCTION AND CREATES A STRONG...

Страница 4: ...pecific application and properly installed Fitting a non return valve after the pump on the installation will prevent the impeller from unwinding and is strongly recommended Pumps improperly sized or...

Страница 5: ...40 years Compact rugged and easy to maintain the SuperFlo VS pump will deliver years of reliable service SuperFlo VS Pump PUMP OVERVIEW Pump Controller Features Simple user interface Motor design red...

Страница 6: ...ine the most satisfactory settings as dictated by the conditions In most cases setting the pump at the lowest speed for the longest duration is the best strategy to minimize energy consumption However...

Страница 7: ...view X Power START FAULT STEP1 STEP2 STEP3 OVERRIDE SETTING SETTING BARGRAPH X Step1 X X X Step2 X X X Step3 X X X Override X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X LED Indi...

Страница 8: ...P 1 key again to change the SPEED setting The SPEED setting LED will illuminate The bar graph will show default SPEED for STEP 1 see figure 2 3 Press UP or DOWN arrows to change the SPEED 4 Press any...

Страница 9: ...he pump is capable of operating Pressing the stop button will turn off the START LED and stop the motor if running If power is connected to the SuperFlo VSVariable Speed Pump motor pressing any of the...

Страница 10: ...er to program an overlap between different STEPs of the schedule The STEP currently being set will always take priority over any previous settings In the event a user attempts to program with a combin...

Страница 11: ...finitely until the user presses the STOP key Note Pressing a STEP key other than for the STEP currently running will cause an immediate transition to the newly selected STEP The pump will continue wit...

Страница 12: ...der to change the OVERRIDE settings if the duration is set to 0 HRS Schedule Advance The Schedule Advance mode allows the user to press the START button at one time of the day with the 24 hour schedul...

Страница 13: ...r more than three 3 seconds The START and OVERRIDE buttons will blink once every second indicating that the time out feature is enabled These LEDs will stop blinking once this feature is cancelled Tem...

Страница 14: ...d to factory defaults Priming The pump will always run the PRIMING sequence when starting from the OFF state except when starting in OVERRIDE The factory Prime settings are 2850 RPM for three 3 minute...

Страница 15: ...National Electrical Code and all applicable local codes and ordinances When in doubt use a heavier gauge larger diameter wire Heavier gauge will allow the motor to run cooler and more efficient 4 Be s...

Страница 16: ...35 mm and will handle any commonly available mating connectors For a direct wire connection the wire insulation should be stripped to a length of approximately 8 mm The terminal block is capable of h...

Страница 17: ...g this area External Supply Range 18 30V AC 24V AC 20 9 30V DC 12 24V DC 20 Figure 6 Wiring Diagram for Automation Control System Inputs UI DIGITAL INPUT CONNECTOR J202 STEP 1 pin 1 STEP 2 pin 2 STEP...

Страница 18: ...oncept can be applied to a solar system or any other type of control system Note There is no schedule for automation system inputs The timing for each speed is controlled directly by the inputs Note T...

Страница 19: ...of the pump pot Note It is important to keep the lid O ring clean and well lubricated 8 Reinstall the lid by placing the lid on the pot Be sure the lid O ring is properly placed Seat the clamp and lid...

Страница 20: ...Inordertoavoidthepossibilityofpersonalinjury makesurethesuctionanddischargevalvesare open and strainer pot temperature is cool to touch then open with extreme caution Besurenottoscratchormarthepolishe...

Страница 21: ...valve close the valve The system should now be free of air and recirculating water to and from the pool Pump Reassembly 1 When installing the replacement seal into the seal plate use soapy water to we...

Страница 22: ...ot drawing air Turn off electrical power to the pump Disassemble see page 20 Pump Disassembly Clean debris from impeller If debris cannot be removed complete the following steps 1 Remove left hand thr...

Страница 23: ...oblem Possible Cause Corrective Action Pump runs without flow Impeller is loose Air leak Clogged or restricted plumbing Check that pump is spinning by looking at fan on back of SuperFloVS Variable Spe...

Страница 24: ...r is running then the FAULT LED will illuminate During the FAULT condition the bar graph LEDs on the interface will turn OFF However the power LED start LED active STEP LED will remain illuminated 3 W...

Отзывы: