
20
Controllers
3. Function test
n
Disconnect sensors on terminals 3, 4, 5 and 6
n
Short terminals by leads. Short terminals 3 and 5 by one lead, and 4 and 6 by the second
one. After switching on, two control lights will turn on green (OK 3/5 and OK 4/6) and
output-relays will be activated.
n
In case of safety units with manual blocking, only one light will turn on. Press RESET in
order to reset the safety unit.
n
If terminals 3 and 4 or 5 and 6 are short, then both channels (K1 and K2 releases) will be
deactivated.
n
If we break connection on 3/5 terminals, K1 relay will be deactivated.
n
If we break connection on 4/6 terminals, K2 relay will be deactivated.
Содержание SSZ-BAT
Страница 1: ...1 Sicherheits Systeme Zimmermann GmbH system manual...
Страница 5: ...5 41 System...
Страница 10: ...10 41 Controllers...
Страница 36: ...36 41 Safety mats...
Страница 41: ...41 Safety rails...
Страница 45: ...45 Safety bumpers...
Страница 49: ...49 Annex...
Страница 54: ...54 Annex 3 4 5 6 SSZ control unit Sequential wiring of various transducers...
Страница 59: ...59 Annex...
Страница 62: ...62 Notes...
Страница 63: ...63 Notes...
Страница 64: ...64 Notes...