User Manual
Universal Serial/PROFIBUS DP Gateway
GT200-DP-RS
WWW.SSTCOMM.COM
13
7. Click the Command you wish to configure and configure the parameters in the Configuration Section to meet
the needs of your project.
8. Once the “Fieldbus”, “Subnet”, Node(s), and Command(s) are configured, click “AutoMap” icon on the
toolbar to map the Modbus data to the PROFIBUS DP network. Then check the mapping address in Conflict
Detection window.
9. Click “Download” to download your configurations into the GT200-DP-RS.