12
Figure 4
Sequence of Operation — Fixed Cycle Operation
Left Chamber Drying – Right Chamber Regenerating (shown)
(continued on next page)
RIGHT
WET GAS
INLET
DRY GAS
OUTLET
RTD 3
3
1
2
ENERGY MGMT OPTION
EXH.
1TC
SET @ 370°F
LEFT
CHAMBER
CHAMBER
REGEN
DRYING
SOL 'C'
SOL 'D'
RTD 2
100 PSIG
SET AT
V7
V8
V6
V5
V4
V3
SET @ 165 PSIG
SOLENOID VALVES 'B', 'D', & 'G' ARE SHOWN ENERGIZED,
SYMBOLS ARE PER ANSI Y32.10 "GRAPHIC SYMBOLS FOR FLUID POWER DIAGRAMS."
SOLENOID VALVES 'A', 'C', 'E', & 'F' ARE SHOWN DE-ENERGIZED.
AS SHOWN FLOW DIRECTION IS:
INDICATES OPTION
3.
2.
1.
PILOT GAS LINE
RIGHT CHAMBER REGEN
LEFT CHAMBER DRYING
NOTES
4.
DPA
DEWPOINTER OPTION
SOL 'B'
SOL 'A'
(RTD4/HS1)
M
SOL 'E'
V11
V12
V13
V9
M1
SOL 'F'
M2
RTD 1
V1
V2
SET @ 650°F
SOL 'G'
V10
SET @ 176°F
SET @ 176°F
2PS
SET @
45 PSIG
SET @
5 PSIG
4PS
1PS
3PS
45 PSIG
SET @
SET @
5 PSIG
V14
F2
F1
O1
O2
PR&G
PI3
PI1
PI2
H1
BD1
BD2
Содержание Pneumatic Products IBP Series
Страница 50: ......