flexitrax™ flexiprobe™ Operation Manual
7 Projects and Surveys
259
Note: You can also use the Next observation button while the video is paused.
Fig. 7.13: Video progress bar (
1
) showing position of observations (
2
)
7.5.4
View or edit an observation
Follow these steps:
1. In the home screen, press the
Projects
button.
2. Open the survey that you want to manage.
In the
Edit Survey
screen now displays; see
3. In the
Edit Survey
screen, press the
List observations
button.
1
2
2
2
2
Содержание CUES flexiprobe
Страница 47: ...flexitrax flexiprobe Operation Manual 3 System overview www cuesinc com 47 3 4 3 Manual drum and PSU...
Страница 114: ...flexitrax flexiprobe Operation Manual 5 System setup www cuesinc com 114 Fig 5 6 Settings menu...
Страница 136: ...flexitrax flexiprobe Operation Manual 5 System setup www cuesinc com 136 Fig 5 16 Yahoo Account security...
Страница 302: ...flexitrax flexiprobe Operation Manual flexitrax flexiprobe OPMAN ENG 07x www cuesinc com 302...