background image

19                                                      

 

  

Mast mounting:  

Is the damping rubber correctly screwed to the flange and checked for 
tightness?   

  

Rotor blades:  

Is the assembly carried out according to the instructions?   

  

Blade Hub:  

Is the hub mounted on the generator shaft?   

Has the central fastening screw been tightened to 30 Nm?   

  

  

  

If our charge controller is not used: 

Connection to the three-phase rectifier (optionally available from us in the shop) 

can  be  found  in  the  package  Leaflet.  This  enables  you  to  provide  the  energy 
generated  by  the  wind  generator  to  downstream  systems.  e.g.  Inverter  input, 
energy management systems, island systems. 

 

NOW YOU CAN GET STARTED! 

 

 

9. Start and stop 

Set the external stop switch to “ON”. If the plus / minus cable is connected to the 

battery  with  the  correct  polarity,  the  wind  generator  should  now  run  if  there  is 
enough  wind  available.  You  can  see  this  on  the  LCD  display  of  the  charge 
controller.  (blade  symbol  turns).  Small  stop  switch  should  be  provided  by  the 
customer or optionally ordered from us in the shop.  

 

 

10. Charging indicator  

The amount of charge is shown on the charge controller display.   

  

Содержание SHARK S601

Страница 1: ...User and installation guide SHARK 12V 24V 48V ...

Страница 2: ... experience with various wind generators used on the high seas Silent Wind from Spreco on sailing boats Electric current is particularly important there and ensures safety and comfort on board Please note that this user manual is part of the product We recommend that you read this manual carefully before installing the SHARK S601 and follow the instructions Please keep this user manual in a safe p...

Страница 3: ... 2 Charge controller 8 3 2 1 Electrical data 8 3 2 2 Mechanical data 8 3 4 Power curve 9 3 5 Dimensions 9 4 Scope of delivery 10 5 Functional description 11 6 Cable sizing 12 7 Assembly 13 8 Commissioning 17 9 Start and stop 19 10 Charging indicator 19 11 Checks 20 11 1 Rotor blades 20 11 2 Screw connections 20 11 3 Bearings seals 20 11 4 Corrosion protection 21 11 5 Mast construction 21 11 6 Elec...

Страница 4: ...ied hybrid charge controller is designed with inputs for solar panels and wind generator for the SHARK S601 Another advantage of the SHARK S601 is that almost no electronics are installed in the housing This drastically reduces maintenance work The electric energy is conducted via three cables down to the regulator The hand laminated carbon fiber blades of the new generation have been successfully...

Страница 5: ...re made from hand laminated carbon fiber material that can withstand even hurricane like wind speeds Always keep away from the rotating blades to avoid injuries Parts or lines flying around can still break the rotor blades If a rotor blade is damaged the system must be shut down by manually operating the stop switch Damage to a rotor blade can result in significant imbalances so that the entire ma...

Страница 6: ...cur Cables must be laid so that there is no mechanical damage to the cables A frayed cable poses security risks Warning Sparks can occur when connecting the batteries Avoid short circuiting the batteries Always make sure there is adequate ventilation It must be ensured that the electrical installation is only carried out by people with expertise Before a storm the SHARK S601 should be braked using...

Страница 7: ...nd generator 3 1 1 Electrical data Generator type Permanent magnet generator 3 phase AC Nominal voltage 12 V DC 24 V DC 48V DC with boost charge controller Rated capacity 600 Watt 700 Watt 800 Watt Nominal wind speed Ca 14 m s Start up wind speed Ca 3 m s Start of charging Ca 200 Upm 3 1 2 Mechanical data Safety test in the wind tunnel 122 km h Rotor diameter 1 50 m Number of blades 3 Blade weight...

Страница 8: ...rocess electronically depending on the individual parameter setting manually with the inbuilt stop switch or with the extended external switch 3 2 1 Electrical data System voltage 12V 24V 48V Max Power input wind generator 600 W 700W 800W Max Current input wind generator 32 A 25A 12 5A Max Power input solar 300 Wp at 12 V Max Current input solar 20 A 10 A 5 A Max Open circuit voltage input solar 1...

Страница 9: ...9 Warranty 24 Months 3 4 Power curve 3 5 Dimensions ...

Страница 10: ...elivery Generator powder coated 1 Fin Carbon 1 Hub 1 Nose cone ABS 1 Rotor blade Carbon 3 Boost charge controller 1 Quickguide 1 Screw set rotor blades 1 Screw set Fin 1 Allen key 4mm 1 Allen key 5mm 1 Allen key 8mm 1 ...

Страница 11: ... with the wind speed That means doubling the wind speed leads to an eightfold increase in performance This is particularly important in stormy weather Our rotor blades are made from high tensile carbon fiber mats hand laminated with epoxy resin This material offers the highest strength with the lowest weight As a result the newly developed blades are extremely light and cannot be destroyed by wind...

Страница 12: ...roller to Battery in m 0 9 10 19 20 29 30 44 45 69 70 110 Cable cross section in mm2 AWG 10 8 16 6 25 4 35 2 System voltage 24 Volt Distance from wind generator to charge controller in m 0 10 11 19 20 29 30 44 45 69 70 110 Cable cross section in mm2 AWG 2 5 14 4 12 6 10 10 8 16 6 25 4 Distance from charge controller to Battery in m 0 9 10 19 20 29 30 44 45 69 70 110 Cable cross section in mm2 AWG ...

Страница 13: ... Distance from charge controller to Battery Inverter in m 0 29 30 69 70 99 100 150 Cable cross section in mm2 AWG 4 12 6 10 10 8 16 6 7 Assembly Before the wind generator assembly you should find the right location This is often the most difficult task Ideal would be if the rotor blades were always flowed evenly This presupposes that the wind generator is installed high enough and free of obstacle...

Страница 14: ...ng at the upper end and additionally attach a second tape two meters lower If the top band blows perpendicularly or moves back and forth up to 30 degrees you have found a suitable location If the tape moves more or even winds around the rod the location is unsuitable This experiment is only a rough statement and should only be carried out with light wind We recommend doing several tries to get a b...

Страница 15: ...ted Therefore it is important to find a suitable location that is free of obstacles in the prevailing wind direction Once you have found the right location the right mast with accessories must be selected The mast outer diameter should be 48 mm and made of stainless steel with a wall thickness of at least 2 5 mm Please also consider possible maintenance work Grounding the mast is also recommended ...

Страница 16: ...it happen that a blade is damaged by external influences a single blade can be ordered by notifying the exact weight of the remaining good blades After the blade assembly the blade set is plugged onto the generator axis and screwed down with the enclosed nut and Allen key Then press the nose cone onto the Hub until it is fully engaged see assembly video ...

Страница 17: ... can start running and cause injuries If you remove the SHARK S601 from the mast to replace the rotor blades you must ensure that the blades do not start moving before you have finished the work 3 AC cable short circuit 8 Commissioning Before releasing up your SHARK S601 please check the correct assembly and installation using the following checklist ...

Страница 18: ...se the controller will be destroyed Caution Always connect the battery to the charge controller first Are all screw terminals tightened Is the external stop switch set to ON CAUTION No voltage may be applied to the stop switch socket This destroys the controller Only connect the enclosed cable harness with socket there see installation video in the download Automatic circuit breaker Automatic circ...

Страница 19: ...his enables you to provide the energy generated by the wind generator to downstream systems e g Inverter input energy management systems island systems NOW YOU CAN GET STARTED 9 Start and stop Set the external stop switch to ON If the plus minus cable is connected to the battery with the correct polarity the wind generator should now run if there is enough wind available You can see this on the LC...

Страница 20: ...the generator must not be operated Check the screw connection after one day of operation and then after one month You can then switch to longer intervals 11 2 Screw connections Check all screw connections that are accessible from the outside for tightness or correct tightening torque Check the rotor blade bolts the central hub nut and the mast attachment in particular 11 3 Bearings seals The beari...

Страница 21: ... System Please bring the wind generator to a standstill first so that all lines are free of voltage Check all connection points for tight fit and corrosion Correct any corrosion that may have occurred and treat with contact spray You should pay particular attention to the battery connections These are to be cleaned and treated with pole grease The battery must be checked and repaired according to ...

Страница 22: ...RUN Generator shaft stiff turn by hand Connecting cable Generator to charge controller damaged Short circuit of AC Electric wire Generator short circuit Customer service Wind generator does not deliver power Possible cause Test Fix Too low wind measure wind speed at rotor height Wind speed at the top of the main mast is higher Wait for more wind charging starts depending on the charge level of the...

Страница 23: ... distilled water not with gel or AGM battery Fuse defective Check conductance Replace the defective fuse and find the reason for the defect Charge controller incorrectly connected check according to plan connect properly Charge controller stop switch is set to STOP Set the stop switch to ON Follow instructions in manual Generator defective cable short circuit Check AC voltage at the input of the c...

Страница 24: ...rt freight costs and freight risks that are directly or indirectly related to this device guarantee Travel expenses to and from the repair center troubleshooting diagnostics and repair work Damage caused by misuse and failure to operate the device especially when installed on an unsuitable mast In the event of damage the buyer must provide proof that the installation was carried out on a suitable ...

Страница 25: ...ucts and services of the electrical industry apply in Germany Name Adress Purchase date SHARK S601 Serial Nr Boost Charge Controller Serial Nr Dealer Dealer adress SPRECO Windgenerator Bach Energiesysteme Brand 74 D 91729 Haundorf Telefon 49 0 4193 8709925 Telefon 49 0 9837 9769838 Mail support sprecowindgenerator com Web www sprecowindgenerator com ...

Отзывы: