19
Mast mounting:
Is the damping rubber correctly screwed to the flange and checked for
tightness?
Rotor blades:
Is the assembly carried out according to the instructions?
Blade Hub:
Is the hub mounted on the generator shaft?
Has the central fastening screw been tightened to 30 Nm?
If our charge controller is not used:
Connection to the three-phase rectifier (optionally available from us in the shop)
can be found in the package Leaflet. This enables you to provide the energy
generated by the wind generator to downstream systems. e.g. Inverter input,
energy management systems, island systems.
NOW YOU CAN GET STARTED!
9. Start and stop
Set the external stop switch to “ON”. If the plus / minus cable is connected to the
battery with the correct polarity, the wind generator should now run if there is
enough wind available. You can see this on the LCD display of the charge
controller. (blade symbol turns). Small stop switch should be provided by the
customer or optionally ordered from us in the shop.
10. Charging indicator
The amount of charge is shown on the charge controller display.