The transfer station connects to a deck side. Consult the
Top Down View for proper placement of the event.
First connect the bottom platform to the two-step
1.
assembly using (3) 3/8" x 1-1/4" button head bolts,
(6) 3/8" washers, (3) 3/8" lock nuts.
Connect the top of the transfer step to deck with (3)
2.
3/8" x 1" button bolts, washer on both sides, and lock
nuts under deck.
Connect the (3) transfer deck legs with (2) 3/8" x 1/4"
3.
button head bolt, washer both sides, and lock nut
under the transfer deck.
Connect the transfer step legs to the step with (2) 3/8"
4.
x 1-1/4" button bolts, washer on both sides, and lock
nuts under deck.
The handhold post will connect through the hole inside
5.
the deck using (4) 3/8" x 1-1/4" button head bolts, (8)
3/8" washers, (4) 3/8" lock nuts.
Lay out and mark (6) ground holes for posts # by
6.
physically setting the transfer steps up to the deck, and
use spray paint to mark the (6) holes.
Dig them 24" deep and 8"" in diameter.
7.
With the help of another pick up and set the transfer
8.
station assembly into the ground holes with re-bars in
the bottom.
Connect the assembly to the deck with (3) 3/8" x 1-
9.
1/4" button bolts, no washer on the outside and 3/8"
washer and lock nuts on the underside of deck.
The bottom end of transfer step is blocked up vertically
10.
and horizontally on bubble.
Connect the left and right handrails to each side
11.
between the left and right deck posts to the vertical
INSTRUCTIONS:
INSTRUCTIONS:
INSTRUCTIONS:
INSTRUCTIONS:
MAINTENANCE:
MAINTENANCE:
MAINTENANCE:
MAINTENANCE:
Touch up any marred paint surfaces.
Periodically check hardware for integrity and tightness.
holes located on the corner of second step.
12. Line up and bolt the bottom end handrails to
outside of steps with (4) 3/8" x 2" button head bolts,
washers and lock nuts under steps.
13. (2) 4 hole attachment brackets, one per post, will be
installed on the "deck side" of posts by sliding the
bracket onto the handrails and setting them level to
the posts. Then using the self-tapping screws attach
the brackets to the post with gasket between bracket
and post, and then tighten set screws.
14. Re-check levels of all (6) posts and the bottom
plank and the entire transfer step. Make sure it is all
level and blocked.
Event: Transfer Station shall be constructed of #9 ga. by
3/4" flattened, expanded metal, including offset kickplates
to fully gaps between decks and steps.
Paint: Shall be oven-cured plastisol.
Hardware: Stainless Steel tamper resistant.
SPECIFICATION:
SPECIFICATION:
SPECIFICATION:
SPECIFICATION:
Содержание Miss Abby
Страница 1: ...Page 1 800 727 8180 www sportsplayinc com Custom Modular Structure Installation Booklet...
Страница 2: ......
Страница 14: ...Page 14 Side view of installed post...