Page 12
Step 4 – Component Installation
1. Begin installing the components by working from the
lowest deck around to the highest deck. Install the
components in either a clockwise or counter clockwise
rotation.
2.
Step 5: Concrete
1. Once all components and posts are tight and level, you
may concrete. A good rule of thumb is two 80 lb. bags
of concrete per hole. Do not “dry bag” the concrete,
always mix per instructions on concrete bag. Be sure to
leave concrete about 2” from the top of the ground to
allow backfill.
2. Be sure that all splattered concrete is washed off of the
posts and components while it is still wet.
3. Block off installation area for at least 48 hours.
Step 6: Final after 48 hours
1. Return in 2 days to backfill concrete, drill and install
drive (roll) pins per instructions, and install safety
surfacing.
2. Inspect all components to insure the hardware is tight
and all panels are level.
3. Make sure all tools and dropped hardware are removed
from play area.
4. Open the playground.