Deck Plan:
Deck Plan:
Deck Plan:
Deck Plan:
found on the Top Down View.
Sheet 2 of 2
Sheet 2 of 2
Sheet 2 of 2
Sheet 2 of 2
The deck(s) connect to the main upright posts using nuts
factory installed in the post according to the specifications
INSTRUCTION:
INSTRUCTION:
INSTRUCTION:
INSTRUCTION:
Event: Steel Decks are constructed of 12 ga. perforated
steel.
Paint: Oven cured plastisol.
Hardware: Stainless steel tamper resistant.
MAINTENANCE:
MAINTENANCE:
MAINTENANCE:
MAINTENANCE:
Touch up any marred paint surfaces.
Periodically check hardware for integrity and tightness.
These are two methods:
The BEST method is to make a table or stand to place
your deck on at the required deck height. The table will
stabilize the deck so you can level it.
You can make a table from sawhorses.
Deck stand or table holds deck while you build around
it.
Block stabilize the posts while table stabilizes the deck.
The second method is to use two people to hold the deck
at the required height and attach the bolts through the
deck to the post. The decks bolts directly to the post
through the factory installed riv-nuts. Use the 3/8" x 1"
button pinned stainless steel bolts with a washer through
the holes in the corners of the decks. There are two holes
in each corner to bolt through. The deck and posts will
stabilize more as you add components.
SPECIFICATIONS:
SPECIFICATIONS:
SPECIFICATIONS:
SPECIFICATIONS:
4
3
2
1
SQUARE AND TRIANGLE DECKS
SQUARE AND TRIANGLE DECKS
SQUARE AND TRIANGLE DECKS
SQUARE AND TRIANGLE DECKS
5
912-333
912-333
912-333
912-333
912-334
912-334
912-334
912-334
Содержание Miss Abby
Страница 1: ...Page 1 800 727 8180 www sportsplayinc com Custom Modular Structure Installation Booklet...
Страница 2: ......
Страница 14: ...Page 14 Side view of installed post...