SPECIFICATIONS 

PARTS LIST 

Event:

 Connects to 3’, 4’, 5’ deck, 7 

¼” step and 8 ½” riser is #9 ga. 
expanded metals, top and bottom 
angle connection to deck and ground 
with ground legs.  Entire ladder is 
PVC coated after fabrication.  Arch 
entry wall is 1 3/8” O.D. steel with 
(4) clamps to connect. 
 

Paint:

  shall be electrostatically 

applied polyester dry powder coating
 

Hardware:

   shall be a combination 

of zinc-plated, stainless steel and 
aluminum. 

Ref Description QTY 

A  

Stepladder 

B Stepladder 

Bottom 

Leg 

C Stepladder 

Arch 

Entry 

D Pipe 

Clamps  4 

E Handrails  2 

 

 

 Hardware 

 

 

 

MAINTENANCE: 
 

• 

Touch up any marred paint 
surfaces. 

• 

Periodically check hardware for 
integrity and tightness. 

INSTRUCTIONS

:  

 
-  Temporarily lay the angle-lip of stepladder onto deck so that there is a 90-degree connection.  Center it 

over the 15” apart holes on top of deck. 

-  Mark on ground for the two bottom legs (20” apart).   
-  Remove ladder and dig two holes 12” wide and 24” deep. 
-  Connect the bottom leg with (2) 1 ¼” x 3/8” button head bolt, washer on top and lock nut on bottom. 
-  Install (2) re-bar in bottom leg pipes and install assembly into ground holes. 
-  Tip up to deck and connect to deck holes (on top of deck) with (2) 3/8” by 2” button head bolt, one 

washer on top and one on bottom, and lock nut. 

-  Connect the arch entry to the “outside” of the posts with (4) pipe clamps.  DO NOT tighten the clamp 

hardware yet. 

-  Connect the left and right handrails so that the top end (end with no holes) goes into the pipe sleeves on 

the arch entry. 

-  Line up the bottom of the handrail (2 per side) to the holes in the bottom side of stepladder. 
-  Connect these with (4) 3/8” by 2” button head bolts, no washer on the inside of the ladder, through 

ladder, then fasten with 3/8” lock nut. 

-  Tighten until lock nut is flush with thread end of bolt. 
-  Make sure arch entry clamps are level to each other and tighten. 
-  Fasten top portion of handrails with 3/8” by 3/8” setscrew. 
 

FOOTING DIAGRAM:

 

C

B

 

36”

10”

10”

               
3’steps 
*36” for 4’steps 
 48” for 5’ steps
 

Содержание 902-289

Страница 1: ...dents Resilient Surfacing should be used under all playground equipment Appropriate publications available at no charge from the Consumer Product Safety Commission include A Handbook for Public Playgr...

Страница 2: ...required amount of resilient safety surfacing material For some equipment Use Fall zones can overlap See Consumer Product Safety Commission Guidelines Diameter and depth of footings illustrated are sa...

Страница 3: ...beyond face of nut All washers T nuts and other fastener hardware used on round pipe or tubing must be hammered down to conform to the curved underlying surface to eliminate catch points DO NOT tight...

Страница 4: ...ghten If too tight the post will swing Tighten when post is level Decks attach to deck clamps using X 2 Button Head bolts washer on top and bottom with lock nuts Connect the deck bolt firmly Additiona...

Страница 5: ...4140 Deck clamp set to corners Dig first four holes Use marker to mark 22 from bottom of posts Use these marks so you can run a 4 level across marks to make sure the tops of the posts are equal to eac...

Страница 6: ...mber and wedges to solidify the posts in their holes as you level the posts Re blocking may be necessary at times in order to achieve level You may also have to widen your holes if they are not dug ce...

Страница 7: ...e deck clamps Use a level and a marker to make sure the clamps are level to each other Then place deck onto clamps and bolt This method works but is less stable than the first method The deck and post...

Страница 8: ...nto bubble in the top or middle will throw off your evious work Adjust the post levels carefully not roughly pr When all 4 posts are plumb and stable drill through the deck clamps and into the posts w...

Страница 9: ...lamps 42 Illustration on next page shows completed deck and 4 posts Deck and post are vertically and horizontally level and clamps are tight Posts are center to deck corners Roll pins are installed Av...

Страница 10: ...lide Page 10 Rev 07 22 03 SportsPlay Equipment Inc 5642 Natural Bridge St Louis MO 63120 314 389 4140 Posts must be blocked solidly for a stable ongoing installation Blocks are removed just before con...

Страница 11: ...1 Hardware Deck Clamps 2 Pipe Clamps 4 MAINTENANCE 1 Touch up any marred paint surfaces 2 Periodically check hardware for integrity and tightness INSTRUCTIONS The Spiral Slide can accommodate any siz...

Страница 12: ...902 289 6 Spiral Slide Page 12 Rev 07 22 03 SportsPlay Equipment Inc 5642 Natural Bridge St Louis MO 63120 314 389 4140...

Страница 13: ...ription QTY A Wall 1 B Clamps 4 Hardware MAINTENANCE Touch up any marred paint surfaces Periodically check hardware for integrity and tightness INSTRUCTIONS The ten rung wall is 48 wide and attached w...

Страница 14: ...15 apart holes on top of deck Mark on ground for the two bottom legs 20 apart Remove ladder and dig two holes 12 wide and 24 deep Connect the bottom leg with 2 1 x 3 8 button head bolt washer on top a...

Отзывы: