581-422 12’ PRIMARY TRIPOD SWING
Installation Guide
9
Tools and Materials
List is for tools and materials needed that are not included with the
playground
Follow manufacturer’s guidelines for proper use of tools and materials.
The best method (also the easiest) to dig the postholes is using a
tractor with a 12” auger attachment.
Shovels (long handled spades)
Post hole digger
Wheelbarrow
Large construction bar (5’)
Claw hammer
Large dead-blow rubber hammer
Small sledgehammer to use in blocking the posts
Strong and sturdy step ladders
Extension cords & power supply
Levels – Magnetic torpedo and 4’ long levels
Scrap lumber to use for shims in post holes to keep posts level
Blocking materials for the post holes (bricks, concrete blocks, etc.)
Files and sand paper
Safety surfacing
Spray paint to mark holes
String line
Cement (2,500 psi minimum)
Straight line or transit level (and tripod) for ensuring hole depths are
at the same level
Содержание 581-422
Страница 4: ...581 422 12 PRIMARY TRIPOD SWING Installation Guide 4...
Страница 5: ...581 422 12 PRIMARY TRIPOD SWING Installation Guide 5...
Страница 16: ...581 422 12 PRIMARY TRIPOD SWING Installation Guide 16 COMPONENT INSTALLATION INSTRUCTIONS...
Страница 20: ...March 2 2016 4 581 422 12 PRIMARY TRIPOD SWING INSTALLATION INSTRUCTION ELEVATION AND FOOTING LAYOUT VIEW...