March 2, 2016  

 

 

581-422 12’ PRIMARY TRIPOD SWING 

INSTALLATION INSTRUCTION 

INSTALLATION STEPS CONTIUDE 

Continue: 

__6) Slide the pipe into the swing end fitting until it’s flush with 
the end fitting then mark the top and bottom hole. With a small drill 
bit drill the marked spots then drill with a 7/16” drill bit through the 
small holes in the pipe. Now secure it with bolt, lock washer and 
the button head nut. See (Detail C). 

__7) 

Attaching Swing Hangers: 

You will need eight swing 

hangers (5), eight D Shackles (8), eight 4/O Chain (7). Assemble 
the D-shackles and chain to the swing hangers. Attach the swing 
hangers to the top rail following spacing on page 4. See (Detail D). 

__8) 

Attaching Seats:

 To attach seats to the chain. You will need 

the four cut proof seats (6), eight of the D shackles (8). Use the D 
shackles and hook the chain and the cut proof belt seat to it. Then 
tighten the bolt that holds the chain and seat. See (Detail E). 

__9) 

Dig footing holes: 

Footing holes may be marked out and dug 

from footing layout, however, it is easier to position swing in 
proper location, mark holes, move swing aside, and dig holes. 

__10) Stand swing upright onto legs and brace in footing holes so 
that 2’ – 3’ of pipe will be under intended level of resilient 
surfacing and the top rail is at desired height. Plumb and level 
entire unit. Tighten all set screws. 

 

 

 

Содержание 581-422

Страница 1: ...2 PRIMARY TRIPOD SWING Installation Guide 1 INSTALLATION INSTRUCTIONS 581 422 12 PRIMARY TRIPOD SWING Please read the entire manual before beginning installation 1 CTN 10 PIPE 11 TOTAL PCS 360 WEIGHT...

Страница 2: ...D SWING Installation Guide 2 TAB SECTION INDEX 1 3D AND 2D DRAWINGS 2 INSTALLATION GUIDE 3 INSTALLATION STEPS 4 COMPONENT INSTALLATION 5 APPENDIX 6 ORIGINAL COMPONENT MAINTENANCE FORMS 7 COMPLETED COM...

Страница 3: ...ING 10 SITE REQUIREMENTS 10 MAINTENANCE 10 PLAY AREA 10 Installation Punch List Error Bookmark not defined Footing Layout Example Error Bookmark not defined Step 1 Layout 11 Step 2 Holes 11 Step 3 Dec...

Страница 4: ...581 422 12 PRIMARY TRIPOD SWING Installation Guide 4...

Страница 5: ...581 422 12 PRIMARY TRIPOD SWING Installation Guide 5...

Страница 6: ...ure and sunlight SportsPlay recommends carefully unpacking the unit and taking an inventory before storing the equipment Care should be taken with all powder coated and thermoplastic coated parts to p...

Страница 7: ...nstalled on vertical posts as per ASTM F1487 Instructions for the placement of these labels are included in the appendix of this booklet SportsPlay will provide manufacturer identification labels that...

Страница 8: ...tion and Public Affairs Washington DC 20207 USA Call 1 800 638 2772 US and Canada only Call 301 504 0990 Direct Link http www cpsc gov For a copy of either the standard for surfacing ASTM F1292 or for...

Страница 9: ...ole digger Wheelbarrow Large construction bar 5 Claw hammer Large dead blow rubber hammer Small sledgehammer to use in blocking the posts Strong and sturdy step ladders Extension cords power supply Le...

Страница 10: ...closed immediately A maintenance section is included in the appendix of this instruction booklet If a part is missing or damaged the playground must be put out of service while the part is replaced La...

Страница 11: ...xt page 2 Once the structure is in the desired location within the play area mark the locations of the post by inserting a stake into the center of each post location see drawing below for an example...

Страница 12: ...re you may start installing concrete You must use concrete with a minimum of 2 500 psi 2 Always pre mix the concrete to the manufactures directions before pouring it into the hole Never put dry concre...

Страница 13: ...are at some point you may want to apply lubricating oil to the hardware Stainless steel hardware has a tendency to seize so if you are planning on removing the hardware you may want to apply lubricant...

Страница 14: ...broken equipment Do not allow children to play on broken equipment or equipment with missing components Make sure there are no unsafe modifications especially ropes tied to equipment Remove all unsafe...

Страница 15: ...422 12 PRIMARY TRIPOD SWING Installation Guide 15 X SET SCREW D SHACKLE 2 3 8 SWING HANGER 5 16 X 1 BUTTON HEAD NUT 5 16 X 2 BUTTON HEAD BOLT 5 16 LOCK WASHER 3 16 ALLEN YELLOW ALLEN BLUE 5 16 ALLEN...

Страница 16: ...581 422 12 PRIMARY TRIPOD SWING Installation Guide 16 COMPONENT INSTALLATION INSTRUCTIONS...

Страница 17: ...uired MAINTENANCE As the owner of the playground you are responsible for maintenance of the equipment and play area A maintenance schedule must be developed and the equipment inspected frequently A ma...

Страница 18: ...elt Seat 4 7 317 140 4 O Chain x 9 6 Long 8 8 342 506 D Shackle 16 9 196 802 x Socket Set Screw 14 10 116 545 5 16 x 2 Button Head Bolt 4 11 216 512 5 16 x 1 Button Head Nut 4 12 326 501 5 16 Lock Was...

Страница 19: ...he bottom of the support post or slide leg on a suitable flat blocking material to prevent it from sinking further into the soil We recommend you use a brick block of wood or several inches of gravel...

Страница 20: ...March 2 2016 4 581 422 12 PRIMARY TRIPOD SWING INSTALLATION INSTRUCTION ELEVATION AND FOOTING LAYOUT VIEW...

Страница 21: ...to take them out to make an adjustment It is recommended that you add a drop of oil to bolts that may have to be removed before you install them Do not tighten bolts all the way until the unit is comp...

Страница 22: ...will be in approximately correct position Assemble swing frame on side on ground If more than one section assemble section by section __4 Attach Center Fitting to End Fitting To do this you will need...

Страница 23: ...e swing hangers Attach the swing hangers to the top rail following spacing on page 4 See Detail D __8 Attaching Seats To attach seats to the chain You will need the four cut proof seats 6 eight of the...

Страница 24: ...turer s directions before you pour it into the footing hole Once the footing has been filled with concrete you should rope of the area for a minimum of 48 hours to allow the concrete set properly __12...

Отзывы: