March 2, 2016
6
581-422 12’ PRIMARY TRIPOD SWING
INSTALLATION INSTRUCTION
BEFORE YOU BEGIN
In addition to the components on the packing list you will need a
tape measure, post hole digger, level and a dry erase marker.
INSTALLATION STEPS
__1)
Review all instructions before beginning:
__2)
Unpack, organize, and identify all components:
Be sure to
place all painted components on a protective surface (cardboard,
cloth, etc…) to prevent damage.
__3)
Assemble Swing Frame:
Layout parts so that when frame is
erected, legs will be in approximately correct position. Assemble
swing frame on side, on ground. If more than one section, assemble
section by section.
__4)
Attach Center Fitting to End Fitting:
To do this you will
need one center fitting (1), one end fitting (2). Slide the end fitting
into one of the sides of the center fitting until it bottoms out then
tighten set screw. See (Detail A).
__5)
Attach Swing End to Legs:
To do this you will need one
1 7/8” x 15’ pipe (3), one swing fitting (1). Place the swing leg into
the swing end fittings. Tighten set Screw. See (Detail B)
__6)
Attaching Middle Post to Swing End:
You will need one
2 3/8” x 11’ pipe (4), one 5/16” x 2 ½” button head bolts (10), one
5/16 x 1” button head nut (11), one 5/16” lock washer (12).
Содержание 581-422
Страница 4: ...581 422 12 PRIMARY TRIPOD SWING Installation Guide 4...
Страница 5: ...581 422 12 PRIMARY TRIPOD SWING Installation Guide 5...
Страница 16: ...581 422 12 PRIMARY TRIPOD SWING Installation Guide 16 COMPONENT INSTALLATION INSTRUCTIONS...
Страница 20: ...March 2 2016 4 581 422 12 PRIMARY TRIPOD SWING INSTALLATION INSTRUCTION ELEVATION AND FOOTING LAYOUT VIEW...