March 2, 2016
5
581-422 12’ PRIMARY TRIPOD SWING
INSTALLATION INSTRUCTION
SPECIFICATIONS
Tube
– FloCoat® Galvanized 1 7/8” O.D. and 2 3/8” O.D.
Hardware
– Stainless steel & tamper resistant
SPECIAL SAFETY & ASTM COMPLIANCE NOTES
INSTALLATION TIPS & TROUBLE SHOOTING
Apply locktite to all bolts during assembly prior to
completely tightening them.
Stainless Steel hardware can occasionally be difficult to use
particularly if you need to take them out to make an
adjustment. It is recommended that you add a drop of oil to
bolts that may have to be removed before you install them.
Do not tighten bolts all the way until the unit is completely
assembled and all components are square and level.
Identify and separate all parts by referencing the detail
drawings and the parts list.
As you unpack and separate the components, use the
cardboard sheets that were used for packing and shipping to
prevent damage to the components. This is particularly true
all Powder Coated and Thermoplastic coated components,
by setting the components on top of the cardboard.
Содержание 581-422
Страница 4: ...581 422 12 PRIMARY TRIPOD SWING Installation Guide 4...
Страница 5: ...581 422 12 PRIMARY TRIPOD SWING Installation Guide 5...
Страница 16: ...581 422 12 PRIMARY TRIPOD SWING Installation Guide 16 COMPONENT INSTALLATION INSTRUCTIONS...
Страница 20: ...March 2 2016 4 581 422 12 PRIMARY TRIPOD SWING INSTALLATION INSTRUCTION ELEVATION AND FOOTING LAYOUT VIEW...