July 30, 2014
7
511-152 STEPPING STONES
INSTALLATION INSTRUCTION
INSTALLATION STEPS CONTINUED
__6)
Install Stepping Stone Plastic Parts:
After the cement has
dried you can install the Stepping Stone Plastic parts. You will need
the 5/16” x 1” bolts (3), 3/8” Flat Washers (4). Place one 5/16”
Flat Washer on to one of the 5/16” x 1” Button Head Bolts. Insert
this through the Plastic Stepping Stone (2) and into the Leg (1) on
the bottom side of the Leg. Repeat this until the Stepping Stones
are installed. (See Detail A)
__7)
Once the concrete has set
, back fill dirt over the footing
holes; inspect the area and components for tools, hazardous debris
and sharp edges. Verify all components are installed and all
hardware is tight and then install the safety surfacing.
__8)
Inspect the components:
for sharp edges and if necessary
file them down and apply touch up paint.