July 30, 2014
5
511-152 STEPPING STONES
INSTALLATION INSTRUCTION
SPECIFICATIONS
Paint
– Electrostatically applied & oven cured powder coat
Hardware
– Stainless steel & tamper resistant
Tube
– FloCoat® Galvanized 1 3/8” OD and 1” OD.
Stepping Stone Leg-
2 3/8” tube MIG welded to 3/16” steel
plate
Stepping Stone Plastic set of parts-
¾” HDPE UV
stabilized plastic
SPECIAL SAFETY & ASTM COMPLIANCE NOTES
Safety Surfacing must extend 72” past the furthest Stepping
Stone, and 72” wider than the greatest distance of the
Stepping Stones.
INSTALLATION TIPS & TROUBLE SHOOTING
SportsPlay Equipment Inc. recommends pre-drilling the
holes in the post when attaching a four-hole bracket with a
number #7 drill bit. This will make the attachment of the
four-hole bracket with the self-tapping screws easier and it
will prevent damage to the screw head during installation.
Apply locktite to all bolts during assembly prior to
completely tightening them.
Stainless Steel hardware can occasionally be difficult to use
particularly if you need to take them out to make an
adjustment. It is recommended that you add a drop of oil to
bolts that may have to be removed before you install them.
Do not tighten bolts all the way until the unit is completely
assembled and all components are square and level.
Identify and separate all parts by referencing the detail
drawings and the parts list.
As you unpack and separate the components use the
cardboard sheets that were used for packing and shipping to
prevent damage to the components. This is particularly true
all Powder Coated and Thermoplastic coated components,
by setting the components on top of the cardboard.