background image

 

  

 

July 30, 2014  

 

 

511-152 STEPPING STONES 

INSTALLATION INSTRUCTION 

BEFORE YOU BEGIN 

In addition to the components on the packing list you will need a a 
shovel or post hole digger, cement, drill with a #7 drill bit, 9/16” 
wrench, tape measure, dry erase marker, level and blocking 
material to support the Stepping Stone Legs. 

INSTALLATION STEPS  

__1) 

Review all instructions before beginning

 

__2) 

Unpack, organize, and identify all components:

  Be sure to 

place all painted components on a protective surface (cardboard, 
cloth, etc…) to prevent damage. 

__3)

 Locate placement of the Stepping Stones: 

See top down 

view of your instruction booklet. 

__4)  

Dig your footings: 

The footing holes for the Stepping Stone 

Legs cannot be any further than 12” apart.   

__5) 

Set Stepping Stone Legs: 

After you have the

 

footings dug 

you will need to place the Stepping Stone Legs (1) in the footing 
holes.  The Stepping Stones can be no further apart than 12” with a 
step height of no more than 6”.  You will need to use blocking 
material to hold the legs in to a level position and to get them to 
stay at the proper height.  Now you can poor the cement into the 
footing holes.  Be sure to use concrete with a minimum 2,500 psi 
and mix the concrete per the manufacturer’s directions before you 
pour it into the footing hole.   

 

 

 

Detail A 

Отзывы: