July 30, 2014
6
511-152 STEPPING STONES
INSTALLATION INSTRUCTION
BEFORE YOU BEGIN
In addition to the components on the packing list you will need a a
shovel or post hole digger, cement, drill with a #7 drill bit, 9/16”
wrench, tape measure, dry erase marker, level and blocking
material to support the Stepping Stone Legs.
INSTALLATION STEPS
__1)
Review all instructions before beginning
__2)
Unpack, organize, and identify all components:
Be sure to
place all painted components on a protective surface (cardboard,
cloth, etc…) to prevent damage.
__3)
Locate placement of the Stepping Stones:
See top down
view of your instruction booklet.
__4)
Dig your footings:
The footing holes for the Stepping Stone
Legs cannot be any further than 12” apart.
__5)
Set Stepping Stone Legs:
After you have the
footings dug
you will need to place the Stepping Stone Legs (1) in the footing
holes. The Stepping Stones can be no further apart than 12” with a
step height of no more than 6”. You will need to use blocking
material to hold the legs in to a level position and to get them to
stay at the proper height. Now you can poor the cement into the
footing holes. Be sure to use concrete with a minimum 2,500 psi
and mix the concrete per the manufacturer’s directions before you
pour it into the footing hole.
Detail A