5
Communication Cable Requirements (for cable-controlled systems only):
Four conductor cable – 28 gauge, twisted pair (two pairs), shielded data cable.
DETERMINING LOCATION AND ORIENTATION
The scoreboard should be positioned so that the greatest number of spectators can easily view it.
Also, consider the best orientation of the scoreboard should the system be used to score a daytime or
afternoon game. The scoreboard should be positioned so that sunlight does not glare off of its face.
In the U.S., placement on the South or West side of the field is recommended. Consult with the local
building or zoning department before final determination and installing the scoreboard.
INSTALLING MOUNTING POLES OR I-BEAMS
NOTE: The following information for installing the mounting poles/beams are suggestions
only. Local codes, field placement, scoreboard options, customer preference, and other
special considerations will determine the specifics of your installation, including footer
specifications, above ground height, and total length of the poles/I-beams.
1. Install the two (2) mounting poles/I-beams (supplied by the customer) on the field with a 4’
center spacing and with 14’-6” of pole/I-beam above ground (refer to the figures below).
2. The poles/I-beams must be set into concrete footers. Make sure the poles are level and plumb
and spaced on 4’ centers. The mounting faces of I-beams must be straight with each other. If
the face of an I- beam is turned, shims will be needed to mount the scoreboard. The required