Spirent B2-800-QD-4-T1S Installation Instructions
System Description
14
|
Spirent B2-800-QD-4-T1S Installation Instructions
PN 71-009377 Rev A May 2022
Test Port Link LED Numbering
The test port link LEDs are numbered as shown in
. Only the number for the first
port of each column is labeled on the front panel of the appliance.
Figure 3.
Front Panel Port Link LED Numbering
shows the assigned port numbering for the first port group (or QSFP-DD800 port).
Note:
The numbering for the port group (or QSFP-DD800 port) increments each of the
sub-port numbers above by 8. Then each subsequent cage increments again by 8 in a
similar manner. For example, if the first port groups (or QSFP-DD800 ports) were set to
2x400G PAM4, the ports would be numbered P1, P2, P8, P9, P16, P17, P24, P25.
Powering up the Appliance
Press the power button on the front of the unit (
) to turn on the
appliance.
The typical boot time is seven (7) minutes. Package switch times (switching from Spirent
TestCenter to another product, or from another product to Spirent TestCenter) and
firmware upgrades take approximately 10-15 minutes.
Table 5.
Appliance Link State LEDs
Speed
Port 1 Sub-port Numbering
PAM4 Mode
NRZ Mode
800G
P1
NA
400G
P1, P2
NA
200G
P1, P2, P3, P4
NA
100G
P1, P2, P3, P4, P5, P6, P7, P8
NA
50G
P1, P2, P3, P4, P5, P6, P7, P8
NA