background image

SPT-N11U and SPT-N12U Chassis Installation Instructions

Rack Mounting the SPT-N11U/SPT-N12U

10

|

SPT-N11U and SPT-N12U Installation Instructions

P/N 71-008728  Rev A, August 2019

Rack Mounting the SPT-N11U/SPT-N12U

This section describes the procedure for installing the chassis in an EIA 19" two-post or 
four-post equipment rack. The following tools and equipment are required for installing 
the equipment:

#2 Phillips-head screwdriver

Eight (8) equipment rack screws and nuts (if required) for your chosen rack

ACC-2021A 4-Post Rack Mount Tray or rack shelf at least 30" deep and capable of 
handling a static load of at least 350 lb for each chassis (for four-post rack mounting)

The chassis is shipped standard with a front mounting flange for four-post racks and a 
mid-mount flange for two-post racks. 

Due to the weight of the system, the power supplies should be installed after properly 
securing the chassis. Refer to 

SPT-N11U/SPT-N12U Chassis Power Supply Installation 

Instructions.

Warning:  

An empty SPT-N11U system weighs approximately 125 lb. An empty SPT-

N12U system weighs approximately 127 lb. 
Spirent recommends that an IT equipment lift be used to rack the system. If one is not 
available, the system should be lifted by four people onto a secured shelf capable of 
handling a static load of at least 350 lb for each chassis, where it can then be secured 
safely using the rack screws. The chassis should be completely empty of modules and 
power supplies when being moved.

Содержание SPT-N11U

Страница 1: ...document is intended to guide you to a safe and successful installation of the Spirent SPT N11U or SPT N12U mainframe chassis In this document Certifications and Standards 4 Introduction 7 Site Selec...

Страница 2: ...cordance with the Software License Agreement the Software which it supplies will operate in material conformity with the specifications supplied by Spirent for such Software for a period of ninety 90...

Страница 3: ...7 dB A weighted sound power level LWA as measured per ISO 3741 Sound Power Noise Measurement and appropriate ear protection should be worn when working in proximity to the chassis Please contact your...

Страница 4: ...se Set aside the accessories and power supplies These will be needed later Carefully lift the chassis out of the box using the side and front handles and securely place it on a level and stable surfac...

Страница 5: ...nterference Characteristics of Information Technology Equipment EN 55024 Limits and methods of measurement of immunity characteristics for information technology equipment EN 60950 Safety of Informati...

Страница 6: ...ins material that presents an environmental concern Spirent encourages users of Spirent provided electrical and electronic equipment to not dispose of the labeled products in waste collection units wh...

Страница 7: ...nd both ventilation locations must remain unobstructed for proper operation Inadequate cooling or airflow can result in an over temperature situation that will cause an automatic system shut down The...

Страница 8: ...45 cm x 48 9 cm x 84 6 cm 30 76 2 cm depth measured from front mounting flange Installation and shipping weight 125 lb 58 6 kg 3 system and 2 slot PSUs and fans installed no test modules installed App...

Страница 9: ...SPT N11U Built in LCD display SPT N12U Front panel LEDs Temperature fan admin link system and system power status Test module slot power status Rear panel LEDs Admin Ethernet link speed and activity C...

Страница 10: ...h chassis for four post rack mounting The chassis is shipped standard with a front mounting flange for four post racks and a mid mount flange for two post racks Due to the weight of the system the pow...

Страница 11: ...ng the front rack ears There is a risk of equipment damage and personal injury due to the weight of the system 1 Attach the center mount brackets with the supplied screws if they are not already secur...

Страница 12: ...in the intended installation location install four 4 rack mount screws through each rack ear and into the rack totaling eight 8 rack mount screws Figure 3 Figure 3 Securing the Center Mount Brackets...

Страница 13: ...with a screwdriver if they are secured to the chassis Figure 4 Figure 4 Remove the Center Mount Brackets 2 Install the ACC 2021A tray or a shelf with a depth of at least 30 and with a static loading...

Страница 14: ...SPT N12U Chassis Installation Instructions Rack Mounting the SPT N11U SPT N12U 14 SPT N11U and SPT N12U Installation Instructions P N 71 008728 Rev A August 2019 Figure 6 Using an Equipment Lift for...

Страница 15: ...connected to a 15A circuit with no other connected equipment and each with its own breaker Installation of this chassis must comply with local and national electrical codes If necessary consult with...

Страница 16: ...fans moving to the left the next socket powers module slots 1 4 then 5 8 etc with the leftmost socket powering slots 9 12 For either chassis configuration if all the slots for a particular power socke...

Страница 17: ...chassis Using the ACC 2018 Hypermetrics Dual slot Card Carrier Describes the procedure for installing and removing test modules that require card carriers for use in the SPT N11U SPT N12U and SPT N4U...

Страница 18: ...Pacific Time Europe Middle East Africa E mail support spirent com Web https support spirent com Phone 33 1 6137 2270 France Phone 44 1803 546333 UK Hours Monday through Thursday 09 00 to 18 00 Friday...

Отзывы: