IM-P706-03
CTLS Issue 1
27
SP7-20 Smart Positioner
3.3 Connection on the device
Fig. 18
1
Cable gland
2
Blind plug
3
Terminals for option modules
4
Terminal attachment kit for digital feedback
5
Terminals for basic unit
2 tap holes ½ 14 NPT or M20 × 1.5 are provided on the left side of the housing for cable entry in the
housing. One of the tap holes is fitted with a cable gland, while the other tap hole has a blind plug.
Note
The connecting terminals are delivered closed and must be unscrewed before inserting the wire.
1.
Strip the wires to approximately 6 mm (0.24").
2.
Connect the wires to the connecting terminals in line with the connection diagram.
Содержание SP7-20
Страница 9: ...IM P706 03 CTLS Issue 1 9 SP7 20 Smart Positioner...
Страница 39: ...IM P706 03 CTLS Issue 1 39 SP7 20 Smart Positioner Fig 21 5 2 SP7 20 HART Parameter Overview...
Страница 55: ...IM P706 03 CTLS Issue 1 55 SP7 20 Smart Positioner...
Страница 56: ...IM P706 03 CTLS Issue 1 56 SP7 20 Smart Positioner...