29
►
Before commissioning up for the first time, check and note if the protective measures
of the system function according to the nationally applicable regulations, amongst others:
Continuity of the connections of the conductor
Insulation resistance
Residual current circuit breaker (RCD)
Tripping current
Tripping time
Hand out the test report and the handover report to the company operating the system.
A function test has been carried out in the factory and is not necessary on-location.
Starting up the BCS SMART
Starting up may only be carried out by an authorised specialist.
The smart BCS bicycle charging station can be connected with the Spelsberg BCS portal online in order to be
able to use all services. In its delivery state, it is already equipped with an LTE access
where separate costs may result.
Connection to the Spelsberg back-end can, in addition to LTE, also be carried out via your local wireless LAN
or an Ethernet connection as an alternative. The descriptions can be found below.
Steps of the installation of a BCS SMART
►
Installation of the station according to the steps specified in the previous chapter.
►
Establishing the data connection to BCS PORTAL (connectivity)
►
BCS portal: create user a organisation
►
BCS portal: add user account station to organisation
►
BCS portal: operate user account station
►
BCS portal: invite other users
Note the registration number on the label inside for step 4
Establishing the data connection to BCS PORTAL (connectivity)
BCS SMART must be connected to the internet and BCS portal
to be able to use all functions.
The following options are available for this purpose:
Connection via Ethernet cable
Connection via WLAN to an existing router
Connection via mobile communications
Connection via Ethernet cable
The Ethernet cable must be installed in the station.
►
De-energise the station.
►
Open the housing and take off the cover.
►
Remove the sealing plug of the opening at the bottom of the charging station and guide the
Ethernet cable into the housing through the fold-out cable gland from the accessories bag.
Содержание 58012201
Страница 25: ...25 Figure 3 Distances for wall assembly in mm Assembly dimensions in mm 1400 min 700 min 700 min ...
Страница 38: ...38 ...
Страница 39: ...39 ...