0112776R4 Page 5 of 9
A. Lower the equipment rack over the cord channel as shown. Note the hinge-
side of each door will go toward the flat edge (or rear) of the table.
Figure 3A
.
B. Open both equipment rack doors.
Figure 3B
.
C. Align the equipment rack and upper cord channel rail mounting holes.
D. Attach the equipment rack to each upper cord channel with (2) 1/4-20 x 1/2”
flanged hex head screws and 1/4-20 keps nuts.
Figure 3B
.
E.
Install (2) 1/4-20 x 1/2” flanged hex head screws through the cord channel
bottom panel into each equipment rack side panel.
Figure 3B
.
flat edge / rear
of table
Figure 3A
open
doors
Figure 3B
(2) 1/4-20 x 1/2” flanged
hex head screws
(4) 1/4-20
keps nuts
equipment rack
side panel
upper cord
channel rail
(4) 1/4-20 x 1/2” flanged
hex head screws
(2) 1/4-20 x 1/2” flanged
hex head screws
Note: The following procedure shows how to attach an optional equipment
rack to the table while the table is still upside-down during the table assembly.
cord channel bottom panel
upper cord
channel rail
upper cord
channel rail
equipment rack
Optional - Attach equipment rack to cord channel