background image

SpectraPure

SpectraPure®Inc.

  

480.894.5437   Call us toll-free  1.800.685.2783    

215 South Industrial Drive,   Suite 2A   Tempe, Arizona   85281-2941

®

6

System Hook-Up

1.  Before connecting The Ultimate DI to any Reverse Osmosis water 
 

source, check for the following conditions:

 

A. The Ultimate is designed to be used on RO water sources.

 

 

It is not intended to fuction as a tap water DI system.

 

B. Check the RO membrane rejection rate. Refer to your RO 

 

 

System manual for rejection rate calculations. The minimum 

 

 

rejection rate recommended for use with The Ultimate is 95%.  

 

 

For optimum performance, the rejection rate should be >97%. 

 

 

The longevity of the de-ionizing cartiridges are directly related  

 

 

to the input water conductivity, pH, and chemistry.

 

C. Check the waste to product water ratio of the RO System. For 

 

 

line-pressure RO Systems, a 4:1 or greater ratio is recommended.

 

D. The flow rate from the RO System should be no greater than 

  1 

gallon/min.

 

E. Water temperature should be less than 110 F.

2.  If you are connecting The Ultimate to a new RO System or have 
 

installed a new RO Membrane in an existing system, allow the 

 

RO System to produce water for at least 2 hours before connect-

 

ing it to The Ultimate.

3.  Attach the product line from your RO System into the (left) input 
 

fitting on The Ultimate.

4.  Attach the blue DI output water tubing into the (right) output
 

fitting on The Ultimate. Do not restrict flow in these lines.

Operation

1.  Slowly open the cold water supply valve to the RO System and 
 

allow the DI housings to fill. You may use pressure up to 80 psi 

 

(5.5 bar). Discard at least 2 gallons of water before using the 

 

system or make sure the monitor’s green light is on when the 

 

red button is pressed.

2.  Initally, air trapped in the DI cartridges is a normal condition and 
 

will not affect the operation of the DI cartridges.

System Start-Up

SpectraPure

®

SpectraPure®Inc

 Fax  480.894.6109 Fax us toll-free 1.877.527.7873

E-mail: [email protected] Visit us on the web www.spectrapure.com

7

The Ultimate DI System has been engineered to provide “fool-proof” 

operation and double assurance that contaminants will not be intro-

duced into the product water, except in cases of extreme negligence.

The design theory to remember is that the cartridges will be replaced in 

a rotational pattern. Stages #1 and #3 will always exhaust their capacity 

first. Stage #1 will always be replaced by rotating Stage #2 forward to 

Stage #1. Stage #3 will always be replaced by rotating Stage #4 forward 

to Stage #3. Always install new DI cartridges in Stages #2 and #4.

Deionization Cartridges #1 and #2 Diagnostic

In order to determine the condition of stages #1 and #2, watch for the 

color to change from the bottom to the top. The color will change from 

a very dark blue to a lighter blue or tan color. Once cartridge #1 has 

changed color by 70 to 80%  it 

must

 be replaced in accordance with 

the following instructions. (For “down flow” DI systems or systems that 

incorporate a permeate pump, the color will change from the top to the 

bottom ).There may be local conditions that affect the color-changing 

characteristics of these DI cartridges. High pH water (due to soda lime 
softening) may prevent these cartridges from changing colors.

Diagnostics & 

System Maintenance

Deionization Cartridges #1 and #2 Replacement 

Materials Needed:

 One DI-SFCC-10 Deionizaton cartridge, 

     filter 

wrench.

Procedure:

1.  Remove the filter housing from Stage #1 by unscrewing it counter
 

clockwise as viewed from the bottom.

2.  Remove and discard the old cartridge from the housing.
3.  Remove the housing and cartridge from Stage #2 and re-install the 
 

cartridge in Stage #1 Make sure the cartridge is installed in the cor-

 

rect direction as marked on the filter housing and that the top seal is 

 

securely attached to the top of the cartridge

4.  Install a new cartridge (DI-SFCC-10) into Stage #2. Re-install the 
 

bottom housings onto the caps by rotating them clock-wise and 

 

tighten with the wrench.

5.  If Stage #3 requires service, proceed to the instructions on page 9. 
 

If no other service is required, turn the system on and check for leaks.

Содержание The Ultimate DI System

Страница 1: ...ro rated the performance of membrane elements for one year from date of receipt by the buyer providing that the loss of performance was not caused by fouling neglect or water conditions exceeding the feed water parameters listed on page 3 of this manual Most municipal water supplies meet these requirements Terms and Conditions of Sale 1 To obtain service under this warranty the defective system or...

Страница 2: ...nates contaminant leakage from exhausted DI cartridges with the addition of secondary back up cartridges An exhausted deionization cartridge will leach the removed impurities back into the water at levels many times higher than originally found in the source water The addition of the two secondary DI stages prevents this leakage When the first SilicaFree Cartridge DI SFCC 10 changes color upon exh...

Страница 3: ... contaminated product water due to exhausted cartridges is completely eliminated With the majority of contaminants now removed by Stages 1 and 2 the water is then passed through two additional stages of DI resin Stages 3 and 4 have our Chloramine Removal Car tridges DI AR CI 10 They will provide longer life than standard mixed bed cartridges when used to treat water containing chlorine chloramine ...

Страница 4: ...tween GREEN and RED between successive depressions of the push to test water purity monitor A Do not press the push to test button rapidly in quick succes sion Wait at least 1 minute between two successive depressions of the button for an accurate reading Q How should the probe be mounted for an accurate reading A The probe should be mounted VERTICALLY at the bottom of the T Q How long does the ba...

Страница 5: ...Needed One DI AR CI 10 Deionizaton cartridge filter wrench Procedure 1 Remove the filter housing from Stage 3 by unscrewing it counter clockwise as viewed from the bottom 2 Remove and discard the old cartridge from the housing 3 Remove the housing and cartridge from Stage 4 and re install the cartridge in Stage 3 Make sure the cartridge is installed in the correct direction as marked on the filter...

Страница 6: ...rapure com Visit us on the web www spectrapure com 7 The Ultimate DI System has been engineered to provide fool proof operation and double assurance that contaminants will not be intro duced into the product water except in cases of extreme negligence The design theory to remember is that the cartridges will be replaced in a rotational pattern Stages 1 and 3 will always exhaust their capacity firs...

Отзывы: