SpectraLink Corporation
Installation
Link WTS – Link 3000 MCU
Table of Contents
1.
ABOUT THIS DOCUMENT
9
1.1.
Contacting SpectraLink
9
1.2.
Icons Used in this Document
9
1.3.
Installation Overview
9
2.
LINK WIRELESS TELEPHONE SYSTEM DESCRIPTION
11
2.1.
The Master Control Unit
12
2.2.
Base Stations
15
2.3.
Link Wireless Telephones
16
2.4.
Operator’s Console
16
3.
SITE PREPARATION
17
3.1.
Required Materials Provided by Customer
17
3.2.
Prepare Location for Shelves
19
3.3.
Prepare Power for Shelves
21
3.4.
Run Cables to Base Station Locations
23
3.5.
Terminate Cables at Base Station Locations
24
3.6.
Prepare Demarc Blocks
25
3.7.
Install Demarc Blocks
28
3.8.
Program Telephone System
28
3.9.
Connect Cables from Base Stations and Phone Lines to Demarc Blocks
29
4.
SYSTEM INSTALLATION
34
4.1.
Facility Analysis
34
4.2.
Check Components
34
4.3.
Install Shelves
35
4.4.
Install Intershelf Junction Panel
36
4.5.
Connect Power to Shelves
37
4.6.
Install Cards
38
4.7.
Connect the Intershelf Junction Panel
41
4.8.
Connect Demarc Block RJ-21 Cables to Interface Modules
41
5.
INSTALL BASE STATIONS
42
5.1.
Mount Base Stations on Dropped Tile Ceilings
42
5.2.
Mount Base Stations On Finished Ceilings
43
Part Number: 72-0059-01-Ha.doc
Page 7