SpectraLink Corporation
Installation
Link WTS – Link 3000 MCU
3.4. Run Cables to Base Station Locations
The Base Station locations should be designated on the building floor plans provided to
the installer. Base Stations can be mounted easily on raised or acoustical ceiling tiles, or
on the wall. Avoid locating Base Stations in high or hard-to-reach places, as this will
hinder maintenance, testing, or repositioning.
Wire Specifications
The customer's wire contractor is responsible for adhering to all local codes
for wiring.
SpectraLink recommends UL-Listed Wire that conforms to the following specifications
for AWG, distance, and number of power pairs required for this installation.
Power
Pairs
Max Cable Feet
22 AWG
Max Cable
Feet
24 AWG
Max Cable
Feet
26 AWG
1 6,000
3,800
2,400
2 N/A
6,000
4,800
3 N/A
N/A
6,000
One additional pair is also required for Data.
For wire runs of less than 3,500 feet
,
attenuation must not exceed 6.8
dB/1,000 feet @ 772KHz.
For wire runs between 3,500 and 6,000 feet
,
attenuation must not exceed 4.5
dB/1,000 feet @ 772KHz.
Wire that is already installed (spare house cable) can be used when it is available. House
cable will usually run from the MDF in the telephone equipment room to Intermediate
Distribution Frames (IDFs) spread throughout the facility. Install new wire from the
closest IDF to the Base Station. Be sure no bridge taps, multiples, or “Y” connections are
created or present.
Determine the amount of wire needed to connect the Base Station to the MCU by scaling
from a floor plan or a sketch, pacing, measuring, or estimating. Remember to include
enough wire to reach the ceiling.
The wire length between the MCU and each Base Station may not exceed
6,000 cable feet.
Install an extra 25 feet of wire at the Base Station to allow for possible
relocation.
Part Number: 72-0059-01-Ha.doc
Page 23