Spectra nTier Verde Array Скачать руководство пользователя страница 15

Replace a Boot Drive in the Verde 4U Master Node

Replace a Boot Drive

October 2013

Boot Drive Replacement

Spectra nTier Verde Array

15

5.

Using

 

a

 

#2

 

Phillips

 

screwdriver,

 

secure

 

the

 

chassis

 

to

 

the

 

rack

 

using

 

one

 

screw

 

through

 

each

 

mounting

 

bracket

 

on

 

the

 

sides

 

of

 

the

 

chassis.

6.

Connect

 

all

 

power,

 

Ethernet,

 

and

 

SAS

 

cables

 

that

 

you

 

disconnected

 

before

 

removing

 

the

 

array

 

from

 

the

 

rack.

7.

Power

 

on

 

the

 

nTier

 

Verde

 

array

 

by

 

pressing

 

the

 

power

 

button

 

on

 

the

 

front

 

panel.

 

The

 

power

 

LED

 

illuminates

 

indicating

 

that

 

power

 

is

 

on.

 

Wait

 

while

 

the

 

array

 

completes

 

its

 

power

on

 

sequence,

 

which

 

takes

 

approximately

 

four

 

minutes,

 

depending

 

on

 

the

 

configuration.

8.

Install

 

the

 

front

 

bezel.

9.

Skip

 

to

 

Complete

 

the

 

Replacement

 

on

 

page 21

.

Figure 15

Secure the chassis to the rack.

Figure 16

Press the power button.

Screw

Mounting

bracket

Power

Power LED

button

Содержание nTier Verde Array

Страница 1: ...SpectraLogic com Spectra nTier Verde Array Boot Drive Replacement...

Страница 2: ...d of the possibility of such damages arising from any defect or error Information furnished in this manual is believed to be accurate and reliable However no responsibility is assumed by Spectra Logic...

Страница 3: ...support spectralogic com United States and Canada Phone Toll free US and Canada 1 800 227 4637 International 1 303 449 0160 Email support spectralogic com Europe Middle East Africa Phone 44 0 870 112...

Страница 4: ...ovide storage for the operating system and StrataView web interface The procedure is different for each size of master node Use the instructions in one of the following sections Replace a Boot Drive i...

Страница 5: ...rde 4U master node Estimated Time 30 minutes Before you Begin Before replacing a boot drive make sure that you have addressed the requirements in this section Gather Materials and Tools Required A gro...

Страница 6: ...i static bags Connect the wristband to the static protection mat or to other suitable ESD grounding Note Keep all electronic components in anti static bags when not in use Discontinue Storage Operatio...

Страница 7: ...the Power screen click Shutdown 3 A confirmation screen displays Confirm the selection to shutdown the nTier Verde array 4 Once the array finishes powering off disconnect the power cords from the pow...

Страница 8: ...the array Remove the Array From a Rack Use these instructions to remove the array from a rack 1 Using a 2 Phillips screwdriver remove the screw on each side of the front of the array Warning The Spect...

Страница 9: ...lly extended and the self locking latches engage on each rack rail 3 While supporting the front of the chassis with one hand press and hold the self locking latches on both inner rails downward While...

Страница 10: ...Any damage to the Spectra nTier Verde caused by failure to protect it from electrostatic discharge ESD voids the Spectra nTier Verde warranty To protect the Spectra nTier Verde drives from damage Wear...

Страница 11: ...closest to the chassis wall Note To remove boot drive 2 you must first remove boot drive 1 4 Locate the clip securing the boot drive to the motherboard Figure 10 shows the clip holding the drive You w...

Страница 12: ...from the failed module 9 Set the failed module aside for return to Spectra Logic see Returns on page 22 10 Connect the power cable to the replacement module The connector is keyed to only fit one way...

Страница 13: ...to reinstall the array in a rack 1 Pull the center section of the outer rails out of the rack until they are fully extended see Figure 13 on page 14 Figure 12 Orient the cover with the tabs facing to...

Страница 14: ...ack 3 Slide the chassis into the rack until the self locking latches engage 4 While supporting the front of the chassis with one hand press the self locking latches on both inner rails downward Push t...

Страница 15: ...es that you disconnected before removing the array from the rack 7 Power on the nTier Verde array by pressing the power button on the front panel The power LED illuminates indicating that power is on...

Страница 16: ...ive in the nTier Verde 2U master node Estimated Time 15 minutes Before You Begin Before replacing a boot drive make sure that you have addressed the requirements in this section Gather Materials and T...

Страница 17: ...c protection mat or to other suitable ESD grounding Note Keep all electronic components in anti static bags when not in use Discontinue Storage Operations Although the boot drives in the nTier Verde 2...

Страница 18: ...ed 2 Locate the boot drive you want to replace Drive 1 is on the left and drive 2 is on the right Caution Any damage to the Spectra nTier Verde caused by failure to protect it from electrostatic disch...

Страница 19: ...ately 20 seconds to allow the drive platters to stop spinning Then slide the drive completely out of the array This delay avoids causing additional damage that might interfere with failure analysis 5...

Страница 20: ...following instructions to reboot the array a From any screen of the StrataView interface click the Power icon in the lower right hand corner The Power screen displays b Click Reboot A confirmation scr...

Страница 21: ...us a check mark in a green circle If a boot drive does not indicate a good status contact Spectra Logic Technical Support see Contacting Spectra Logic on page 3 nTier Verde 2U master node Confirm the...

Страница 22: ...LL of the packaging material shipped with the replacement component including any anti static bags or foam inserts Use the return label and instructions that were included with the replacement compone...

Отзывы: