Spectra nTier Verde Array Скачать руководство пользователя страница 13

Replace a Boot Drive in the Verde 4U Master Node

Replace a Boot Drive

October 2013

Boot Drive Replacement

Spectra nTier Verde Array

13

14.

Orient

 

the

 

array

 

cover

 

over

 

the

 

chassis

 

with

 

the

 

tabs

 

facing

 

toward

 

the

 

front

 

of

 

the

 

array.

15.

Insert

 

the

 

tabs

 

into

 

the

 

slots

 

in

 

the

 

chassis

 

and

 

rotate

 

the

 

cover

 

down.

16.

Using

 

a

 

#1

 

Phillips

 

screwdriver,

 

install

 

the

 

four

 

screws

 

to

 

secure

 

the

 

cover

 

to

 

the

 

array

 

(see

 

Figure 7

 

and

 

Figure 8

 

on

 

page 10

).

Reinstall the Array in a Rack

Use

 

the

 

instructions

 

in

 

this

 

section

 

to

 

reinstall

 

the

 

array

 

in

 

a

 

rack.

1.

Pull

 

the

 

center

 

section

 

of

 

the

 

outer

 

rails

 

out

 

of

 

the

 

rack

 

until

 

they

 

are

 

fully

 

extended

 

(see

 

Figure 13

 

on

 

page 14

).

Figure 12

Orient the cover with the tabs facing to the front of 

the array.

Front of array

Warning

The Spectra nTier Verde array weighs between 57 lb (25.8 kg) and 136 lb (61.9 kg) 
depending on how many drives are installed. Use extreme caution when moving it. 
Always use two people, one on each side, when lifting or moving it.

WARNUNG

 

Die Spectra nTier Verde wiegt zwischen 25,8 kg und 61,9 kg je 

nachdem, wie viele Laufwerke installiert sind. Seien Sie besonders vorsichtig, wenn 
Sie es bewegen. Immer zwei Personen, eine auf jeder Seite, beim Heben oder 
Bewegen.

Содержание nTier Verde Array

Страница 1: ...SpectraLogic com Spectra nTier Verde Array Boot Drive Replacement...

Страница 2: ...d of the possibility of such damages arising from any defect or error Information furnished in this manual is believed to be accurate and reliable However no responsibility is assumed by Spectra Logic...

Страница 3: ...support spectralogic com United States and Canada Phone Toll free US and Canada 1 800 227 4637 International 1 303 449 0160 Email support spectralogic com Europe Middle East Africa Phone 44 0 870 112...

Страница 4: ...ovide storage for the operating system and StrataView web interface The procedure is different for each size of master node Use the instructions in one of the following sections Replace a Boot Drive i...

Страница 5: ...rde 4U master node Estimated Time 30 minutes Before you Begin Before replacing a boot drive make sure that you have addressed the requirements in this section Gather Materials and Tools Required A gro...

Страница 6: ...i static bags Connect the wristband to the static protection mat or to other suitable ESD grounding Note Keep all electronic components in anti static bags when not in use Discontinue Storage Operatio...

Страница 7: ...the Power screen click Shutdown 3 A confirmation screen displays Confirm the selection to shutdown the nTier Verde array 4 Once the array finishes powering off disconnect the power cords from the pow...

Страница 8: ...the array Remove the Array From a Rack Use these instructions to remove the array from a rack 1 Using a 2 Phillips screwdriver remove the screw on each side of the front of the array Warning The Spect...

Страница 9: ...lly extended and the self locking latches engage on each rack rail 3 While supporting the front of the chassis with one hand press and hold the self locking latches on both inner rails downward While...

Страница 10: ...Any damage to the Spectra nTier Verde caused by failure to protect it from electrostatic discharge ESD voids the Spectra nTier Verde warranty To protect the Spectra nTier Verde drives from damage Wear...

Страница 11: ...closest to the chassis wall Note To remove boot drive 2 you must first remove boot drive 1 4 Locate the clip securing the boot drive to the motherboard Figure 10 shows the clip holding the drive You w...

Страница 12: ...from the failed module 9 Set the failed module aside for return to Spectra Logic see Returns on page 22 10 Connect the power cable to the replacement module The connector is keyed to only fit one way...

Страница 13: ...to reinstall the array in a rack 1 Pull the center section of the outer rails out of the rack until they are fully extended see Figure 13 on page 14 Figure 12 Orient the cover with the tabs facing to...

Страница 14: ...ack 3 Slide the chassis into the rack until the self locking latches engage 4 While supporting the front of the chassis with one hand press the self locking latches on both inner rails downward Push t...

Страница 15: ...es that you disconnected before removing the array from the rack 7 Power on the nTier Verde array by pressing the power button on the front panel The power LED illuminates indicating that power is on...

Страница 16: ...ive in the nTier Verde 2U master node Estimated Time 15 minutes Before You Begin Before replacing a boot drive make sure that you have addressed the requirements in this section Gather Materials and T...

Страница 17: ...c protection mat or to other suitable ESD grounding Note Keep all electronic components in anti static bags when not in use Discontinue Storage Operations Although the boot drives in the nTier Verde 2...

Страница 18: ...ed 2 Locate the boot drive you want to replace Drive 1 is on the left and drive 2 is on the right Caution Any damage to the Spectra nTier Verde caused by failure to protect it from electrostatic disch...

Страница 19: ...ately 20 seconds to allow the drive platters to stop spinning Then slide the drive completely out of the array This delay avoids causing additional damage that might interfere with failure analysis 5...

Страница 20: ...following instructions to reboot the array a From any screen of the StrataView interface click the Power icon in the lower right hand corner The Power screen displays b Click Reboot A confirmation scr...

Страница 21: ...us a check mark in a green circle If a boot drive does not indicate a good status contact Spectra Logic Technical Support see Contacting Spectra Logic on page 3 nTier Verde 2U master node Confirm the...

Страница 22: ...LL of the packaging material shipped with the replacement component including any anti static bags or foam inserts Use the return label and instructions that were included with the replacement compone...

Отзывы: