![SPECS CCX 70 Скачать руководство пользователя страница 5](http://html1.mh-extra.com/html/specs/ccx-70/ccx-70_user-manual_1343044005.webp)
1
CCX 70
V1.1 | 29 April 2016
Chapter 1 – Introduction
Welcome to the user manual for the SPECS CCX 70. This controls and monitors the water cool-
ing for SPECS X-ray sources.
This chapter explains briefly how to use the manual and points you toward further sources of
information.
Most importantly, it contains safety notices that you should read before operating the equip-
ment.
1.1
About
The manual is divided into the following chapters:
Chapter 2 has the installation procedures to get the instrument ready for operation.
Chapter 3 describes the requirements for the cooling water supply.
Chapter 4 covers the normal operating procedures.
Chapter 5 contains a list of error messages and offers some troubleshooting measures.
Chapter 6 has some maintenance procedures.
Chapter 7 contains technical details, including specifications and connector pin assignments.
1.2
Information
This manual describes the CCX 70 and its use with X-ray sources. For safe and reliable oper-
ation, you should also refer to the following manuals:
The X-ray source manual for installation, special operating notices and maintenance of the
source.
UXC 1000 manual for information about the power supply, its operation and troubleshoot-
ing procedures.
For further advice and assistance, please also contact SPECS support:
Tel.
+49 30 46 78 24-0
email: [email protected]
If you need to return this SPECS product for repair, service or upgrade, please first contact
SPECS support. We will provide you with a Return Merchandise Authorization (RMA) as well as
details for correct packaging and shipment of the instrument. This will ensure safe trans-
portation and speedy processing.
Содержание CCX 70
Страница 1: ...CCX 70 Cooling Water Controller User Manual V1 1 29 April 2016...
Страница 4: ...CCX 70 V1 1 29 April 2016 7 4 Interior Details 32 7 5 Specifications 33 Index 35 iv...
Страница 8: ...CCX 70 V1 1 29 April 2016 This page intentionally left blank 4...
Страница 13: ...9 CCX 70 V1 1 29 April 2016 Figure 1 Connection scheme for water cooling...
Страница 14: ...CCX 70 V1 1 29 April 2016 This page intentionally left blank 10...
Страница 22: ...CCX 70 V1 1 29 April 2016 This page intentionally left blank 18...
Страница 26: ...CCX 70 V1 1 29 April 2016 This page intentionally left blank 22...
Страница 32: ...CCX 70 V1 1 29 April 2016 This page intentionally left blank 28...
Страница 38: ...CCX 70 V1 1 29 April 2016 This page intentionally left blank 34...
Страница 40: ...This page intentionally left blank CCX 70 V1 1 29 April 2016 36...