Removal of Liner
Electrical - SPECK Controller Installation
When replacing liner or removing liner for repairs; remove the four (4) screws (part #9/1) which hold the square
cover (part #8) to the jet housing. Remove all screws (part #9/2, 9/3 & 9/4) except the top two, which hold the
clamping ring (part #3) and gasket (part #12) to the jet housing. Back out the two remaining screws approximately
halfway and check for any movement of the jet housing from the wall. (NOTE: If the two counter sunk screws
(part #27) which hold the jet housing to the wall were installed, the jet housing should not move, and the two
remaining screws can be removed.) Remove one of the remaining two screws and slide the clamping ring (part
#3) to the side. Replace all the screws before removing the last screw. Remove or replace the liner. Reverse the
process to install liner.
NOTE: When replacing the clamping ring and screws: locate screw heads under liner, make a small cut on the liner
at the screw heads and push the liner over the screw head.
WARNING: The wiring of the pool motor and control box should be done by a licensed electrician in accordance with all
local, state, and federal codes. Be certain that the motor frame and control box are properly grounded. Motor name plate lists
voltage, phase, amp draw, and other information as well as wiring connection instructions.
This section concerns the electric motor and control box for BaduStream II swimjet system.
CAUTION: Before installing the Speck Pump, read the entire pump owner’s manual found in the pump box.
Consult local codes for minimum distance between pump and pool. Locate pump as close to the pool as practical.
CAUTION: There is 50ft of cable included with the touch button. If a longer distance to the control box is required, a junction
box can be installed above the water line to splice additional cable as required.
NOTE: The System ON/OFF LED touch button is installed in a 1-1/2” threaded housing. This housing may be installed
in any 1-1/2” return fitting, either below the water line or above the water.
BONDING: As required by National Electrical Code, the pump motor must be electrically bonded to the pool structure
(reinforced bars, etc.) by a solid copper conductor not smaller than No. 8 AWG via the external copper bonding lug on the
pump motor.
GROUNDING: Permanently ground the pump motor and control box using a conductor of appropriate size.
CAUTION: DO NOT connect to electric power supply until the unit is permanently grounded.
NOTE: Single phase control boxes equipped with GFCI are shown on pages 17-18. Other options are available. Please contact
the factory (800) 223-8538 for assistance.
Connecting the SPECK controller to a WiFi network for the FIRST TIME:
1. Before connecting the SPECK controller to the WiFi network, stand where the SPECK equipment is located and with your
mobile device in-hand assure that the signal strength to the WiFi network is good to excellent (weak signals will cause
problems).
2. Make sure the power to the SPECK Device is turned ON. There is a green indicator on the controller board to indicate power.
A small “o” will be flashing on the LED display.
3. Give the homeowner the BADUConnect app manual and allow them to finish the App setup. For more information, Call
(800) 223-8538 or visit www.baduconnect.com for additional copies of the BADUConnect App instructions.
Pump Motor:
Connect to the #10 green headed ground screw provided inside the motor terminal box.
Control Box:
Connect to the aluminum grounding terminal strip on the inside of the control box enclosure.