09.05.2007 TB-b BTA_einhaengeanlagen_v2_engl.indd
46
Once the unit is
fi
lled it will prime
by itself after a
short time. If this
is not the case,
please repeat the
fi
lling as described
under point 6.
*) Only necessary
for 400 V 50 Hz
3 ~ models
6. - Filling the Unit and Start-up
6.1.1
With BADU Jet impulse, click the massage hose onto the nozzle of the
unit, then push a hose (e.g. garden hose) into the nozzle of the massage
hose. Cover the remaining opening with your hand.
Open air drain valve* on the pump and
fi
ll unit with water through the
garden hose. Make sure that the unit is well aerated. As soon as water
seeps out of the air drain valve, close valve and remove garden hose
and massage hose.
6.1.2
With BADU Jet Standard, insert water hose (e.g. garden hose) into the
nozzle of the unit and cover the remaining opening with your hand. Open
air drain valve on the pump and
fi
ll unit with water. Be sure that the unit
is suf
fi
ciently aerated. As soon as water seeps out of the air drain valve,
shut valve and remove water hose.
6.1.3
With BADU Jet swing and BADU Jet action, unscrew the red
fi
ller plug
and
fi
ll unit by means of a water hose or a watering can (approx. 20
liters). Once the pump is
fi
lled put red plug back in place and tighten
carefully by hand. The pump will now prime.
6.2
Press position switch (n° 27 in the spare-parts
fi
gure) and brie
fl
y switch
unit ON and OFF with push button in order to check the direction of
rotation of the motor. Note the directional arrow on the pump. In case of
incorrect direction of rotation, switch 2 phases.*
6.3
Put cover back into position and tighten. When assembling, mind the
position switch!**
6.4
After verifying that all pertinent rules and regulations have been
observed, start unit by means of push button.
6.5
Filling up of the BADU Jet active Version 2
The air in the pump is removed and replaced with water using the
vacuum hose and the pump of the
fi
lter installation.
This is done as follows:
After having secured the BADU Jet onto the edge of the pool.
ATTENTION: For the priming/aeration to be effective the air regulation
knob MUST be closed.
6.5.1 Fill the vacuum cleaner hose with water by pushing it in the water verti-
cally. Then place one end onto the nozzle of the counter current unit and
place the other end, making sure the hose is still
fi
lled with water, on the
skimvac in the skimmer.
6.5.2
Turn on the
fi
lter pump. The
fi
lter pump will now suck in water through
the jet unit hereby drawing out the air that is trapped in it and replacing it
with water. As the air from the jet unit reaches the
fi
lter pump there may
be a momentary drop in the
fl
ow through the
fi
lter pump. Remove the
vacuum hose from the skimvac and keep the end of the hose under
water. Wait a short while until the
fi
lter pump has re-primed. Place the
hose back on the skimvac again and repeat this process as often as is
**) Tighten the
screws only by
hand. Do not use
force!
Содержание Badu Jet V2 Active
Страница 1: ......
Страница 16: ...09 05 2007 TB b BTA_einhaengeanlagen_v2 indd 15 Abb 3 Abb 4 ...
Страница 17: ...16 09 05 2007 TB b BTA_einhaengeanlagen_v2 indd Abb 6 Abb 5 ...
Страница 19: ...18 09 05 2007 TB b BTA_einhaengeanlagen_v2 indd Schaltplan BADU Jet active Version 2 230 V 50 Hz 1 Abb 13 ...
Страница 20: ...09 05 2007 TB b BTA_einhaengeanlagen_v2 indd 19 Schaltplan BADU Jet standard Version 2 230 V 50 Hz 1 Abb 14 ...
Страница 23: ...22 09 05 2007 TB b BTA_einhaengeanlagen_v2 indd Abb 17 ...
Страница 24: ...09 05 2007 TB b BTA_einhaengeanlagen_v2 indd 23 Abb 18 ...
Страница 25: ...24 09 05 2007 TB b BTA_einhaengeanlagen_v2 indd Abb 19 Abb 20 ...
Страница 26: ...09 05 2007 TB b BTA_einhaengeanlagen_v2 indd 25 Abb 21 ...
Страница 29: ...28 09 05 2007 TB b BTA_einhaengeanlagen_v2 indd Abb 22 ...
Страница 32: ...09 05 2007 TB b BTA_einhaengeanlagen_v2 indd 31 Abb 23 ...
Страница 35: ...34 09 05 2007 TB b BTA_einhaengeanlagen_v2 indd Abb 24 ...
Страница 38: ...09 05 2007 TB b BTA_einhaengeanlagen_v2 indd 37 Abb 25 ...
Страница 55: ...09 05 2007 TB b BTA_einhaengeanlagen_v2_engl indd 54 Fig 3 Fig 4 ...
Страница 56: ...55 09 05 2007 TB b BTA_einhaengeanlagen_v2_engl indd Fig 6 Fig 5 ...
Страница 62: ...61 09 05 2007 TB b BTA_einhaengeanlagen_v2_engl indd Fig 17 ...
Страница 64: ...63 09 05 2007 TB b BTA_einhaengeanlagen_v2_engl indd Fig 19 Fig 20 ...
Страница 65: ...09 05 2007 TB b BTA_einhaengeanlagen_v2_engl indd 64 Fig 21 ...
Страница 68: ...67 09 05 2007 TB b BTA_einhaengeanlagen_v2_engl indd Fig 22 ...
Страница 71: ...09 05 2007 TB b BTA_einhaengeanlagen_v2_engl indd 70 Fig 23 ...
Страница 74: ...73 09 05 2007 TB b BTA_einhaengeanlagen_v2_engl indd Fig 24 ...
Страница 77: ...09 05 2007 TB b BTA_einhaengeanlagen_v2_engl indd 76 Fig 25 ...
Страница 94: ...09 05 2007 TB b BTA_einhaengeanlagen_v2_frz indd 93 Schéma 3 Schéma 4 ...
Страница 95: ...94 09 05 2007 TB b BTA_einhaengeanlagen_v2_frz indd Schéma 5 Schéma 6 ...
Страница 101: ...100 09 05 2007 TB b BTA_einhaengeanlagen_v2_frz indd Schéma 17 ...
Страница 102: ...09 05 2007 TB b BTA_einhaengeanlagen_v2_frz indd 101 Schéma 18 ...
Страница 104: ...09 05 2007 TB b BTA_einhaengeanlagen_v2_frz indd 103 Schéma 21 ...
Страница 107: ...106 09 05 2007 TB b BTA_einhaengeanlagen_v2_frz indd Schéma 22 ...
Страница 110: ...09 05 2007 TB b BTA_einhaengeanlagen_v2_frz indd 109 Schéma 23 ...
Страница 113: ...112 09 05 2007 TB b BTA_einhaengeanlagen_v2_frz indd Schéma 24 ...
Страница 116: ...09 05 2007 TB b BTA_einhaengeanlagen_v2_frz indd 115 Schéma 25 ...
Страница 120: ......