![Speck pumpen Badu Jet V2 Active Скачать руководство пользователя страница 46](http://html.mh-extra.com/html/speck-pumpen/badu-jet-v2-active/badu-jet-v2-active_installation-mounting-and-operating-instructions_1341779046.webp)
45
09.05.2007 TB-b BTA_einhaengeanlagen_v2_engl.indd
For the safety of
the swimmers do
not operate the
unit without hou-
sing cover!
*) For BADU Jet
active: attach hose
directly to the con-
verter situated in
the terminal box of
the pump motor
5. - Installation
5.1
Select mounting site and prepare in accordance with page 22
fi
g. 17.
For BADU Jet active see page 24
fi
g. 20. When the unit is installed on an
aboveground pool, the telescoping safety support must be used. See
page 23
fi
g. 18. For BADU Jet active see page 24
fi
g. 19.
5.2
Make sure the shipment contains all parts enumerated in the packing list.
5.3
Place unit on the pool edge and mark mounting holes.
5.4
Remove unit again, drill holes of 10 mm diameter at markings.
5.5
Insert brass expanding bolt (25) and fasten bonded metal (rubber metal)
buffer (26), see page 17
fi
g. 10.
Make sure that the bolts are securely anchored in the base plate so that
the unit will be totally stable.
5.6
Place unit onto bonded-metal buffers and fasten by means of hex bolts
(32) with lock washers (31) plus another washer (30), see page 17
fi
g.10.
5.7
By equalizing the distance, the actual distance between the unit housing
and the pool edge is adjusted. This will result in added stability for the
unit.
5.8
Plug in woven-fabric
fl
exible tubing (6), 14 mm dia., for air-intake onto
the hose tail of the air regulator and fasten by means of clamp (18), see
page 17
fi
g. 7. The connection is located inside the housing.
5.9
Push plastic tubing (36), page 17
fi
g. 7, dia. 3 x 1,5 mm from the
pneumatic pushbutton onto the hose tail of the pressure converter at the
control box.*
5.10
Before connecting the power supply, please carefully read part 7,
“Electrical Connection”, and part 8, “Electrical Connection at Installation
Site”.
5.11
Connect power supply in accordance with Part 7, “Electrical Connection”
5.12
ATTENTION! This is important! When you put the cover back in its
place, make sure that it snaps snugly into place over the position switch.
Fasten the cover securely to the base plate**. The position switch is now
activated, the circuit is closed and the unit is ready to function.
5.13
Connect the safety-catch of the housing with the housing unit, see
page 17
fi
g. 9.
**) Tighten the
screws only by
hand. Do not use
force!
Содержание Badu Jet V2 Active
Страница 1: ......
Страница 16: ...09 05 2007 TB b BTA_einhaengeanlagen_v2 indd 15 Abb 3 Abb 4 ...
Страница 17: ...16 09 05 2007 TB b BTA_einhaengeanlagen_v2 indd Abb 6 Abb 5 ...
Страница 19: ...18 09 05 2007 TB b BTA_einhaengeanlagen_v2 indd Schaltplan BADU Jet active Version 2 230 V 50 Hz 1 Abb 13 ...
Страница 20: ...09 05 2007 TB b BTA_einhaengeanlagen_v2 indd 19 Schaltplan BADU Jet standard Version 2 230 V 50 Hz 1 Abb 14 ...
Страница 23: ...22 09 05 2007 TB b BTA_einhaengeanlagen_v2 indd Abb 17 ...
Страница 24: ...09 05 2007 TB b BTA_einhaengeanlagen_v2 indd 23 Abb 18 ...
Страница 25: ...24 09 05 2007 TB b BTA_einhaengeanlagen_v2 indd Abb 19 Abb 20 ...
Страница 26: ...09 05 2007 TB b BTA_einhaengeanlagen_v2 indd 25 Abb 21 ...
Страница 29: ...28 09 05 2007 TB b BTA_einhaengeanlagen_v2 indd Abb 22 ...
Страница 32: ...09 05 2007 TB b BTA_einhaengeanlagen_v2 indd 31 Abb 23 ...
Страница 35: ...34 09 05 2007 TB b BTA_einhaengeanlagen_v2 indd Abb 24 ...
Страница 38: ...09 05 2007 TB b BTA_einhaengeanlagen_v2 indd 37 Abb 25 ...
Страница 55: ...09 05 2007 TB b BTA_einhaengeanlagen_v2_engl indd 54 Fig 3 Fig 4 ...
Страница 56: ...55 09 05 2007 TB b BTA_einhaengeanlagen_v2_engl indd Fig 6 Fig 5 ...
Страница 62: ...61 09 05 2007 TB b BTA_einhaengeanlagen_v2_engl indd Fig 17 ...
Страница 64: ...63 09 05 2007 TB b BTA_einhaengeanlagen_v2_engl indd Fig 19 Fig 20 ...
Страница 65: ...09 05 2007 TB b BTA_einhaengeanlagen_v2_engl indd 64 Fig 21 ...
Страница 68: ...67 09 05 2007 TB b BTA_einhaengeanlagen_v2_engl indd Fig 22 ...
Страница 71: ...09 05 2007 TB b BTA_einhaengeanlagen_v2_engl indd 70 Fig 23 ...
Страница 74: ...73 09 05 2007 TB b BTA_einhaengeanlagen_v2_engl indd Fig 24 ...
Страница 77: ...09 05 2007 TB b BTA_einhaengeanlagen_v2_engl indd 76 Fig 25 ...
Страница 94: ...09 05 2007 TB b BTA_einhaengeanlagen_v2_frz indd 93 Schéma 3 Schéma 4 ...
Страница 95: ...94 09 05 2007 TB b BTA_einhaengeanlagen_v2_frz indd Schéma 5 Schéma 6 ...
Страница 101: ...100 09 05 2007 TB b BTA_einhaengeanlagen_v2_frz indd Schéma 17 ...
Страница 102: ...09 05 2007 TB b BTA_einhaengeanlagen_v2_frz indd 101 Schéma 18 ...
Страница 104: ...09 05 2007 TB b BTA_einhaengeanlagen_v2_frz indd 103 Schéma 21 ...
Страница 107: ...106 09 05 2007 TB b BTA_einhaengeanlagen_v2_frz indd Schéma 22 ...
Страница 110: ...09 05 2007 TB b BTA_einhaengeanlagen_v2_frz indd 109 Schéma 23 ...
Страница 113: ...112 09 05 2007 TB b BTA_einhaengeanlagen_v2_frz indd Schéma 24 ...
Страница 116: ...09 05 2007 TB b BTA_einhaengeanlagen_v2_frz indd 115 Schéma 25 ...
Страница 120: ......