8
Fig.1:
Bolt the two the brackets to the frame first, but only hand tight.
Fig.1:
Bolt the drive-side box panel to the brackets, adjust the position to fit the frame size, then torque the four bolts to 25 in-lbf (2.8 Nm).
Fig.2:
Install the box hardware (tube, tire lever, 16g C02 cartridge, C02 head, valve extender, EMT tool). See steps below.
3
4
Fig.3:
Install the EMT tool into the receptacle beneath the door.
Fig.4:
Make sure there’s no air at all in the tube, then insert the valve into the valve hole.
5
6
Fig.5:
With the valve in the hole, wrap the tube around the hardware core.
Fig.6:
Pinch the tube at the opposite end of the core, then wrap the tube down and around the core. The location of the pinch and tube wrapping direction provide the most clearance
between the tube and the box when connecting the two panels.
7
8
Fig.7:
Wrap the tube holder band around the tube to hold it in place.
Fig.8:
Install the non-drive-side panel with all the hardware onto the frame, then close the door to lock the panel in place.
WARNING! Ensure all the parts are securely installed in the SWAT Road Box, the bolts are properly torqued and the removable panel is properly installed, with the door
fully closed (locked). Do not ride with an unlocked panel. A loose panel can fall off and interfere with the safe operation of the bicycle.
Please note all instructions and notices are subject to change and updates without notice.
Please visit www.specialized.com for periodic tech updates.
Feedback: [email protected]
SPECIALIZED BICYCLE COMPONENTS
15130 Concord Circle, Morgan Hill, CA 95037 (408) 779-6229
0000090875_UM_EN_R1, 10/17