background image

Spearhead

Q2000HD, Q2500HD & Q2800HD Flail mower

19

Spearhead Warranty

The Spearhead Warranty

Spearhead warrants that the Spearhead machine referred to in the Warranty Registration Form will be free from
defects in materials and workmanship for a period of 12 months from the date of sale.  This warranty does not affect
your statutory rights, but merely adds to them.  Should you have a problem within 12 months from the date of sale
please contact your original Spearhead dealer, or Spearhead’s Service Department.  Any part found to be defective
during this period will be replaced or repaired, at Spearhead’s discretion, by the dealer or a Spearhead Service
Engineer.

Spearhead Warranty Conditions

1

The Warranty Registration Form must be completed and returned to Spearhead within 30 days of the date of
sale.

2

This warranty does not cover defects arising from fair wear and tear, wilful damage, negligence, misuse,
abnormal working conditions, use in competition, failure to follow Spearhead’s instructions (oral or written,
including all instructions and recommendationmade in the Operator’s Manual) or alteration or repair of the
machinery without Spearhead’s approval.

3

The machinery must have been serviced in accordance with the Operator’s Manual and the Service Log must
have been kept up to date and made available to the dealer should service, repair or warranty work be
undertaken.

4

This warranty does not cover claims in respect of wearing parts such as blades, flails, paintwork, tyres,
belts, hydraulic hoses, bearings, bushes, linkage pins, top links, ball ends unless there is a manufacturing
or material defect or the cost of normal servicing items such as oils and lubricants.

5

This warranty does not cover any expenses or losses incurred whilst the machinery is out of use for warranty
repairs or parts replacement.

6

This warranty does not extend to parts, materials or equipment not manufactured by Spearhead, for which
the Buyer shall only be entitled to the benefit of any such warranty or guarantee given by the manufacturer to
Spearhead.  Only genuine Spearhead replacement  parts will be allowable for warranty claims.

7

All parts replaced by Spearhead under warranty become the property of Spearhead and must be returned to
Spearhead if Spearhead so request.  Such parts may only be disposed of after a warranty claim has been
accepted and processed by Spearhead.

8

Spearhead is not liable under this warranty for any repairs carried out without Spearhead’s written consent or
without Spearhead being afforded a reasonable opportunity to inspect the machinery the subject of the
warranty claim.  Spearhead’s written consent must, therefore, be obtained before any repairs are carried out
or parts replaced.  Use of non-Spearhead parts automatically invalidates the Spearhead Warranty.  Failed

components must not be dismantled except as specifically authorised by Spearhead and dismantling of
any components without authorisation from Spearhead will invalidate this warranty.

9

All warranty claims must be submitted to Spearhead on Spearhead Warranty Claim Forms within 30 days of
completion of warranty work.

Using the machine implies the knowledge and acceptance of these instructions and the
limita tions contained in this Manual.

Содержание Q2000HD

Страница 1: ...n are inevitable Should you find the information given in this book different to the machine it relates to please contact the After Sales Department for advice Please ensure that this manual is handed...

Страница 2: ...ontents of this manual before being allowed to proceed If the machine is resold the Operators Manual must be given to the new owner Fill in the details below you will find it useful to refer to when o...

Страница 3: ...other national standards associated with its design and constructions as listed in the Technical File Signed Status Date on behalf of Spearhead Machinery Ltd Genral Manager Genral Manager Genral Manag...

Страница 4: ...nts 7 Attaching to the Tractor 8 Setting Up and Adjustment 9 Height Adjustment 9 Mechanical Offset 9 Optional Hydraulic Offset 9 Front Linkage Mounting 10 540 or 1000 rpm 10 Operation 11 Rotor Care 12...

Страница 5: ...ensure that the machine is firmly on the ground and the rotor has stopped spinning n Never stop the engine with the PTO engaged n Always check that all guards are properly fitted check there are no d...

Страница 6: ...ing Warning Do not remove open guard Warning Beware of overhead electrical powerline Warning Shut off engine remove key Warning Beware of escaping fluid Warning Carefully read operator s manual before...

Страница 7: ...n Spearhead strongly recommend 50 90hp 4 cylinder tractor with category 2 rear linkage n Minimum tractor weight including ballast must be 2500kg n PTO must be independent live drive to enable continu...

Страница 8: ...ime it may be necessary to adjust the length There should be maximum engagement of the sliding tubes without bottoming at the shortest operation position To check first connect the mower to the tracto...

Страница 9: ...fitted Mechanical offset The linkage A frame Fig 3 can be moved along the tube to obtain numerous settings from central to fully offset by simply slackening the clamping bolts positioning the A frame...

Страница 10: ...nkage mounting Simply remove the clamping bolts and revolve the A frame through 180 so the linkage mounting pins are facing the rear of the mower It is recommended the slotted hole in the top link bra...

Страница 11: ...sible forward speed bearing in mind the density of growth the terrain and the available horsepower taking extra care when turning particularly on slopes When turning it is not necessary to lift the ma...

Страница 12: ...ng in very stringent conditions to comply with our rigid quality control requirements Never operate with bolts loose or flails missing Never change to a different spec or type of flail this will immed...

Страница 13: ...eck that all gearbox bolts are tight When the machine is new there will be a bedding in period when very frequent checking is important It is imperative the grub screws are checked on the taper locks...

Страница 14: ...ssing This will cause severe vibration and lead to rapid bearing wear and quickly cause the hood to crack n Blunt flails leave an untidy finish and absorb excessive power when re sharpening always wea...

Страница 15: ...washing until fresh grease shows at least 50 pumps Dismantle and clean PTO sliding surfaces and re grease universal joints Lubricate sliding head stock bushes Regulary n Check the condition of drive b...

Страница 16: ...extra protection and to prolong life of the skids special hard facing rods can be used Storage At the end of the season before storing thoroughly wash the machine removing all traces of grass and dirt...

Страница 17: ...en transporting offset machines on the highway due to their width Max 20mph on highway Servicing and maintenance Gearbox Inspect seals check bolts for tightness Flail rotor Check bolts for tightness c...

Страница 18: ...of implement Shaft incorrect length i e bottoming out Resize PTO shaft as recomm ended Lack of maintenance Grease PTO shaft as recomm ended Flails worn Replace worn flails Rotor speed direction Check...

Страница 19: ...gs bushes linkage pins top links ball ends unless there is a manufacturing or material defect or the cost of normal servicing items such as oils and lubricants 5 This warranty does not cover any expen...

Страница 20: ...e first anniversary of the date of sale and the Service Report form must have been completed and stamped by the servicing dealer or Spearhead Service Engineer and sent to Spearhead within 14 days afte...

Отзывы: