
EMERGENCY TANK SHOWER TRAINING | PG.
5
INSTALLATION
How to install
The Water collection bund is sent
attached to bottom of the Tank Shower.
Disconnect, remove and locate and install/
mount Water collection bund into final
desired position, on suitable concrete
foundation. Secure using suitable
mounting hardware at all (4) mounting
tab locations.
NOTE:
This surface shall be flat/level and
suitable to support the weight of the unit
with a full tank of water (minimum 6000
lbs. total).
Orient and install unit in final desired
position either on Water collection bund
(if supplied) or on suitable concrete
foundation, and secure using suitable
mounting hardware at all (4) mounting
tab locations.
NOTE:
This surface shall be flat/level and
suitable to support the weight of the unit
with a full tank of water (minimum 6000
lbs. total).
Connect desired drain piping to outlet
of Water collection bund following all
applicable local, state, and national
plumbing codes.
Remove all “lifting” braces located at top
of unit and inside the shower area, along
ceiling. Save all bracing for future use.
Remove strap ties holding foot treadle in
place, if supplied.
Using suitable lifting apparatus (crane,
etc.) and rigging, properly attach rigging
to lifting mounts at the top of the unit
near the tank lid, and carefully stand unit
upright. Ensure the center of the unit is
directly under the lifting apparatus at
all times, until vertical. Watch for unit to
swing slightly when lifted from floor.
NOTE:
The tank shower is also supplied
with forklift truck “lifting” braces, located
inside the showering area, just below the
inner ceiling area for easy vertical upright
lifting using forks from a lift crane or fork
truck.
Disconnect all temporary shipping
brackets that are holding the unit in place.
NOTE:
After removal of support bracket-
ing, if drain sump pan is included proceed
to step #5, if not proceed To step #7.
5
8
6
9
10
7
Outlet
Typical shipping hold down brackets.
Lift bracing located in shower area,
near ceiling.