
It is important that the entire fl oor frame be anchored after the building is erected.
Below are recommended ways of anchoring.
Anchoring Down The Building
Anchoring
XA07
Anchoring into Concrete:
1. For poured concrete slab or footing or patio blocks:
Use 1/4" x 2" (6 mm x 51 mm) Lag Screws.
2. For Anchor Post of Concrete poured after building is
erected: Use 1/4" x 6" (6 mm x 152 mm) Lag Screws.
Anchoring into Wood/Post:
Use 1/4" (6 mm) Wood Screws. There are 1/4" (6 mm)
dia. holes provided in the frames for proper anchoring.
1.
2.
1.
2.
8
Содержание RGB108FGEU
Страница 30: ......
Страница 31: ...728220319 Anchoring Anchor your building at this time Anchoring JC32 RGB108ONEU RGB108FGEU ...